![Intermatic IPURE PE25K120V Installation Manual Download Page 8](http://html1.mh-extra.com/html/intermatic/ipure-pe25k120v/ipure-pe25k120v_installation-manual_2077705008.webp)
Page 6
Section 3.5 Mounting the Control Box (Continued)
2.
The Control Box must be mounted vertically on a flat surface and a minimum of 5 ft (1.5m)
horizontal distance (or more, if local codes require) from the pool/spa.
3.
Locate a position for your Control Box within 10 ft (~3 meters) of where the Cell will be installed
and within 2 ft of the power supply to ensure enough wire is available.
All four sides of Control Box
must have air ventilation for
proper heat dissipation.
4.
Because the box acts as a heat sink dispersing heat from
inside the box, do not block the four sides of the Control
Box. Do Not mount the system inside a panel or tight
enclosed area.
WARNING
5.
Secure the hanging rack on the wall using the enclosed
screws and anchors. 1/4” (8mm) drill bit should be used for
the anchor holes.
6.
Hang the Control Box on the mounted hanging rack.
7.
Hardwire the power cable to the time clock as
indicated in the wiring instructions below.
*Check the label on the side of the Control Box
for the proper voltage specification on your
system (i.e. 120v or 240v).
8.
Do not extend the cable leading to the cell. This
decreases the system’s efficiency and will void
warranty coverage. Please contact the
manufacturer for installations demanding a
longer cell cable.