![INTERLUBE AX1 Service And Maintenance Manual Download Page 7](http://html.mh-extra.com/html/interlube/ax1/ax1_service-and-maintenance-manual_2077400007.webp)
7
5.1 Inspection Procedures
The following inspection procedures are
recommended to help ensure proper operation of the
AX chassis lubrication system. Once the reservoir
refill interval has been determined – every 3 days,
once a week, every 3 weeks, etc. – make certain
that interval is part of your scheduled maintenance.
A. Inspect all lubrication points for signs of
FRESH grease.
B. Check the condition of all fittings and
connections. Tighten or replace loose or
damaged fittings.
C. Check all lubrication lines; make certain that
there are not any breaks. Check for wear or
chaffing that may lead to leakage.
D. Check pump operation using Manual Override
on AX3 (29).
•
•
Indication
Light
Manual
Override
button
(29)
Manual Override AC3
CAUTION
To ensure proper operation of the lubrication
system, fill the reservoir (12) only with
clean lubricant.
5.0 Recommended Preventative
Maintenance
After initial installation, and after any service
replacement of lube system components, perform all
of the following preventive maintenance checks once
a shift for a period of one (1) week to verify that the
AX chassis lubrication system is operating properly.