Chapter 3: Installation
2. Carefully remove the fiber optic cable.
3. Turn the lever of the transceiver module to a horizontal position.
4
. Pull out the module gently through the lever.
Note:
Never pull out the module without making use of the lever or the push bolts on
the module.
Removing the module with force
could damage the module and the
SFP/SFP+ module slot of the industrial PoE+ switch.
NS2052-8P-2C Industrial PoE+ Switch User Manual
17