Chapter 3: Installation
Wall mount plate mounting
Note:
Follow all the wall mount plate installation steps as shown in the example.
To install the industrial PoE+ switch on the wall:
1.
Remove the DIN
-rail from the industrial PoE+ switch. Use the screwdriver to loosen
the screws to remove the DIN
-rail.
2. Place the wall-mount plate on the rear panel of the industrial PoE+ switch.
3. Use the screwdriver to screw the wall mount plate onto the industrial PoE+ switch.
4
. Use the hook holes at the corners of the wall mount plate to hang the industrial
PoE+ switch on the wall.
5. To remove the wall mount plate, reverse the steps above.
Installing the SFP transceiver
SFP transceivers are hot-pluggable and hot-swappable. They can be plugged in and
removed to/from any SFP port without having to power down the industrial PoE+ switch
(see below).
NS2052-8P-2C Industrial PoE+ Switch User Manual
15