I N S T A L L A T I O N M A N U A L
X - S T R E A M ™ S L I D E
13
XS-IM Rev. 7/08 (SBK-XS INSTALL)
STEP FIVE:
Assemble the Flume Sections – CONT.
Utilizing hardware kit XS-102-SS, attach the exit section to the lower flume section. Align
the four holes in the flange, push 3/8” bolt through a flat washer, then through the pre-drilled
holes in the flanges, then push bolt through a flat washer, then a lock washer and through
a 3/8” nut. Hand tighten at this time.
STEP SIX:
Alignment of Flume Sections
There is enough tolerance in the flange connections to provide a smooth and even transition
of the sliding surface between the flume sections.
Once the two flume sections and the exit section are bolted together hand tight, then gently
push or pull on the flume sections to ensure a smooth even alignment of the sliding surface.
Next, starting with the exit section, tighten the center bolts first and then tighten the two
outer bolts maintaining a smooth sliding surface.
Repeat this process on the flange between the upper and lower flume.
Fig. 13
Fig. 14
Fig. 15
Gasket
STEP SEVEN:
Attach the Legs to the Flume
Insert the top of the long leg into leg receiver of the upper flume, and the top of the short leg
into the leg receiver of the lower flume. Align holes, then Utilizing hardware kit XS-103-SS,
place a 3/8” lock washer over a 3/8” bolt, then flat washer, then push bolt through the
pre-drilled holes in the PVC ladder into the nuts embedded in the leg receiver, and hand tighten.
Do not fully tighten nuts at this time.
Fig. 16