I N S T A L L A T I O N M A N U A L A D R E N A L I N E ™ S L I D E
14
ADR1-IM Rev. 4/16 (ADR-INSTALL)
Fig. 18
STEP SEVEN: Position Slide Assembly on Deck
First, set the ladder at 16˚ using a slope finder as shown in Figure 19. Then adjust the ladder
level side to side by placing a level against the outside edge of the steps as shown in Figure 20.
Fig. 19
Fig. 20
Level the long and short PVC legs on both axis using a bubble level as shown in Figure 21.
Fig. 21
Summary of Contents for Adrenaline Slide
Page 2: ......