I N S T A L L A T I O N M A N U A L A D R E N A L I N E ™ S L I D E
8
ADR1-IM Rev. 4/16 (ADR-INSTALL)
LIST OF REQUIRED TOOLS
Tools required for assembly and installation of Adrenaline slide:
NOTE: USE PROVIDED ANTI-SEIZE ON ALL BOLTS!
NOTE: Use slide box and packaging during assembly to protect slide components
from damage from the decking surface.
STEP ONE: Attach the Ladder to the Entry Section
Thread the flex PVC hose from the entry section through the step tube assembly and out the
pre-drilled hole above the bottom step. Utilizing hardware kit ADR-103-SS and anti-seize,
attach the ladder to the entry section on the ground. Be careful not to scratch the slide; use the
cardboard box the slide arrived in for protection. Insert the top of the ladder into the ladder
receiver on the entry section and align the holes. (See Fig. 2 & 3) Place a 3/8” flat washer over
a 3/8”x9-1/2” bolt with anti-seize, then push bolt completely through the pre-drilled holes in the
entry section leg receiver and the PVC ladder; then place a 3/8” flat washer then a 3/8” lock
washer then a nut on the bolt; hand tighten only. (These will be tightened after attachment
to flume/exit section.
NOTE: Install bolts from step side – nuts will be under entry section.
Fig. 2
Fig. 3
Fig. 1
1. Hammer
2. 3/8" drive ratchet
3. 3/8" x 6" ratchet extension
4. 1/2" deep socket (deep
socket is necessary)
5. 9/16" socket
6. 9/16" box end ratchet
wrench
7. Drill with 3/8" masonry bit
8. Tape measure
9. PVC Pipe Cutter
10. Level
11. Angle Finder
12. Pliers
13. Razor Knife
IMPORTANT NOTE: The Adrenaline pool slide uses a proprietary water supply and drain
system. Water is supplied at the top of the slide as well as to the drain unit in the exit. The
exit drain also serves to remove any standing water when the slide is not in use. The plumbing
is factory installed but the drain in the exit section must be connected to the entry water
outlet plumbing during slide installation. The exit section is plumbed with a length of 3/8”
clear vinyl tubing and a red cap as shown in Figure 1. The red cap will facilitate pulling the vinyl
tubing through the lower and upper flume sections. The red cap will be cut off and discarded
when the slide plumbing is connected.
RED CAP
Summary of Contents for Adrenaline Slide
Page 2: ......