background image

21 

 

The constructor suggest to constantly control the box, making the scheduled checks, and prompt act 
in case of anomalies, unusual damages or breaks. 

 

6.1. ORDINARY MAINTENANCE

 

 

CAUTION 

The  maintenance  deadlines  indicated  here  below  are  to  be  considered  indicative,  and  refers  to  normal 
usage conditions. The product conditions can vary in relation to the type of usage, the usage frequency 
and to the environmental features (presence of dust,..). In case of heavy duty conditions, the maintenance 
checks should be increased.

 

 

 CAUTION 

It is advisable to use the same kind of lubricant during all the interventions. The greasing points must be 
cleaned accurately with compressed air before the lubrification; in this way,  dust, mud and other foreign 
matters will not mix with the lubricant. 

 

Scrupulously perform the following operations: 

 

EVERY DAY: 

Before the use, visually inspect the box, paying particular attention to eventual breakages 

Check the PVC awning integrity 

EVERY WEEK: 

Lubricate the sliders (mobile version) 

EVERY 6 MONTHS

Check  the  general  condition  of  the  structure;  if  necessary,  substitute  the  usured  or  damaged 

components. Always use original spare parts. 

Check all the screws 

Check the ground-fixing systems. 

EVERY 24 MONTHS: 

General inspection of the constructor, with report of the most stressed components.  

 

 

 

Summary of Contents for CARAVAN BOX

Page 1: ...ON USE AND MAINTENANCE DUAL BOX CARAVAN BOX MAXI BOX COPRIPISCINA INTENDA S r l Via V Pareto 3 37045 S Pietro di Legnago VR Tel 39 0442 601031 600270 Fax 39 0442 25164 http www intenda it e mail info...

Page 2: ...X DESCRIPTION AND TECHNICAL SHEET 7 2 1 General description 7 2 2 Components 8 2 3 Fabric s characteristics 10 3 INSTALLATION 11 3 1 Handling and transport 12 3 2 Place and requirements for the instal...

Page 3: ...d for translations into other languages which do not conform to the original meaning This manual reflects the state of the product at the time of supply and cannot be considered inadequate only becaus...

Page 4: ...have been properly eliminated Make sure that all the guards and other protections as well as the structural fixings are in place and that all the safety devices are present and efficient Make sure tha...

Page 5: ...late is shown in the following drawing 1 5 Warranty Intenda s products are guaranteed as by law with effect from the date stated on the invoice During this period INTENDA S r l will remove in an appro...

Page 6: ...expense of INTENDA S r l Warranty is meant to be ex works Legnago VR All the tools and optional parts eventually supplied by the dealer are not subject to the warranty In the box building process INTE...

Page 7: ...ns can cause damages to people and things It is particularly important for safety not to hang or apply any type of load at the structure or at the top cover of the box In particular children must not...

Page 8: ...oupled in height The mobile version includes also tension bars stretching devices for Copripiscina h 200 5 PVC SLIDING CURTAIN WITH ZIG ZAG OPENING on both sides 6 ALUMINIUM CROSSBEAM Starting from th...

Page 9: ...9 3 6 2 8 1 4 7 5...

Page 10: ...1100 Dtex Weft 100 PES 1100 Dtex Fabric s weight Ca 550 gr m2 Finishing gloss lacquered Breaking strength Warp Ca 250 DaN 5 cm DIN 53354 Weft Ca 180 DaN 5 cm Tear strength Warp 25 DaN DIN 53363 Weft...

Page 11: ...s a preventive investigation by a competent technician for a detailed analysis of the urban planning regulations in force in the installation area of the box The manufacturer assumes no responsibility...

Page 12: ...3 Installation Before starting the installation if electrical equipment utilization is needed make sure you do not work in wet areas use only intact extension cords according to the place of use use s...

Page 13: ...according to this instruction The uprights must be lifted up maintaining the crosses in a slightly position photo 2 3 4 5 An arch must be linked to the second upright photo 6 and 7 P H O T O 2 P H O...

Page 14: ...de where the iron hooks are positioned photo 8 and 9 the remaining arches have to be assembled in a way to complete the structure photo 10 and 11 the tarpaulin keder must be inserted in the lateral sl...

Page 15: ...er of the arches in order to facilitate this operation it is advised to put some lubricant spray into the groove photo 14 15 16 17 the top covers must be fixed with the screws to the lower part of the...

Page 16: ...st be tensioned BASE VERSION using the proper stretching device not included and fixing the screws of the lower part of the crosses photo 22 and 23 MOBILE VERSIONE putting the tension bars in regulati...

Page 17: ...the typical meteorological conditions of that particular place strong wind 4 GENERAL SAFETY PRINCIPLES It is recommended to follow the safety requirements indicated on the structure and into the inst...

Page 18: ...ON AREA The structure can be opened and closed by manual handling by pushing it to the back The handling operations should be always done on the ground Any folding operation from a raised position it...

Page 19: ...rticular the box must not be used without PVC awnings with missing broken safety and fixing devices in explosive atmosphere or in place with potential fire hazard to contain materials with non conform...

Page 20: ...ng of the operator during the installation process Breaking of the restraining elements during adverse wind in this case there is the risk for every exposed person to get hit by the structure Structur...

Page 21: ...me kind of lubricant during all the interventions The greasing points must be cleaned accurately with compressed air before the lubrification in this way dust mud and other foreign matters will not mi...

Page 22: ...norms ATTENTION Respect laws about use and disposal of the cleaning and handling products in force in the country where the structure is used Respect also the manufacturer s provisions We evaluate a...

Reviews: