Changing the DIP switch status, must re-power.
Installation
:
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipment are prepared or not.
Installation require as below
1. Avoid in the sunshine, keep away from the heat fountainhead
or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3.
Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4.
Screw, nut, tool provide by yourself.
5.
Power need: Redundant, dual 24VDC (12VDC~48VDC)
6. Environment: -40 to 75°C
Storage Temperature: -45°C to 85°C
Relative humidity 10% to 95%
DIN-Rail Installation
In order to use in industrial environments expediently,
IT-ES308-IU-4F adopt 35mm DIN-Rail installation, the
installation steps as follows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will insert into place as shown
below.