48-Port Gigabit Ethernet PoE+ Managed Switch with Four 10G SFP+ Uplinks
User Manual
17
b.
Use the screws provided with the equipment rack to mount the Switch on the rack and
fix it.
3.2.2
Desktop Installation
Users can place the switch on a clean, dry, sturdy support structure such as a desk, table or
bench that can fully support the weight of the switch and its connections:
Ensure that the air around the switch is well ventilated.
3.3
Power Cord Connection
Ensure that the ground wire is connected before connecting the power cord.
Connect the AC power cord
Follow these steps to complete the connection:
a.
Connect one end of the switch to the power socket on the back panel of the switch
cabinet.
b.
Plug the other end of the power cord into an external AC power outlet to power the
switch.
c.
Check whether the status indicator on the front panel of the switch is ON. The indicator is
ON to indicate that the power supply is connected properly and that the switch is
initializing.