24-Port 10/100/10 2-Port 1000/10000Mbps SFP+ Ethernet Switch |
9
3.1.2 Rack-mountable Installation in a 19-inch Cabinet
The switch can be mounted with an EIA standard-sized, 19-inch rack, which can be
placed in a wiring closet with other equipment. To install the switch, follow these
steps:
Attach the mounting brackets on the switch
ʼ
s side panels (one on each side) and
secure them with the screws provided.
Figure 5 - Attaching Brackets
Use the screws provided with the equipment rack to mount the switch on the rack and
tighten it.
Figure 6 - Mounting switch
3.1.3 Power On the Switch
The switch is powered on by the AC 100~240V 50/60Hz internal high-performance
power supply. Follow the next tips to turn on the switch:
AC Electrical Outlet:
Intellinet recommends using a single-phase three-wire receptacle with a neutral outlet
or a multifunctional computer-professional receptacle. Make sure to connect the metal
ground connector to the grounding source on the outlet.