Hardware Installations and Upgrades
46
Intel
®
Server System H2000JF Family Service Guide
Figure 71. Installing the 2.5" Backplane Board
3.
Reconnect all cables to the backplane.
Installing and Removing the Power Distribution Board
Removing the PDB
1.
Remove top cover and power supply units from chassis.
2.
Remove power cables and PMBus* cable between PDB and backplane.
3.
Release the four screws of upper PDB board and remove it.
Figure 72. Removing the Upper PDB
4.
Release the four screws of lower PDB board and remove it.