
AMBUS® Link
37
6.7.5. Import driver template
1. Press
2. Press
3.
4. Press
Import driver template
6.7.6. Delete driver template
1. Select a driver template
2. Press
The reporting date reading is deleted
6.8 Configuring a logger via web server
COMMENT
Correctly choose reading times
•
Reading times depend on the circumstances and the dimensioning
of the M-Bus network
•
The reading cycle applies for the entire M-Bus network
•
For 100 or more meters at least 2 min per reading
•
For 250 meters at least 5 min per reading