background image

© Intatec Ltd 2014

6

3

3

10

5

6

7

G½B

Installer to apply

suitable Loctite thread 

sealant - 2 drops

8

9

Concealed Supply

www.divapor.com

Summary of Contents for i-sport SP9206CP

Page 1: ...We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or otherwise Intatec Ltd Airfi...

Page 2: ...at WRc on Tel 01495 248454 or Institute of Plumbing on Tel 01708 472791 All products MUST be re commissioned to suit site conditions to ensure optimum performance levels of the product are obtained S...

Page 3: ...screw 9 2 Screw cap 5 1 back entry leg 10 1 Blanking cap SP9207CP only Check Content Before commencing remove all components from packaging and check each component with the contents list Ensure all p...

Page 4: ...te provision must be made to ensure the water quality including limescale when installing the shower the presence of impurities may damage the self closing cartridge If the system has not been used fo...

Page 5: ...er supply to the shower or thermostatic mixing valve to remove any debris that may be in the supply pipework The i sport compact panel shower should be positioned at a convenient height for most users...

Page 6: ...s in the shower panel as a template mark their positions on the wall or use to drill pilot holes Ensure the shower panel will be vertical when fitted Drill six holes and using the wall plugs and screw...

Page 7: ...Intatec Ltd 2014 6 3 3 10 5 6 7 G B Installer to apply suitable Loctite thread sealant 2 drops 8 9 Concealed Supply w w d i v a p o r c o m...

Page 8: ...hread which will lock the component in place Fit the back entry leg 5 using a suitably sized spanner located on the two flats onto the concealed supply fitting using the fibre washer 8 Remove the show...

Page 9: ...eting the Installation Fit the shower head cover 2 to the panel and secure it in position with the self taping screw 4 Remove the screws caps 9 from the bottom of the panel and fit them as shown 2 4 9...

Page 10: ...NUING OPERATION OF THE SELF CLOSING VALVE B FOR THIS REASON THE OUTLET HOLE MUST BE KEPT UNRESTRICTED When the operating button is released the water flow will stop automatically after the pre defined...

Page 11: ...Intatec Ltd 2014 10 Dimensions 15 1000 146 777 G B 18 31 85 w w d i v a p o r c o m...

Page 12: ...finish and should be treated with care An occasional wipe with a mild washing up liquid on a soft damp cloth followed by a thorough rinsing is all that is required Do not use an abrasive or chemical h...

Reviews: