6
Identify Line and Load
Reconnect Power
Disconnect Power
Remove the Old Switch
Installation
Turn off power to your switch at the
electrical service panel.
Remove the old switch and disconnect
the wires. If your box lacks neutral
wires, stop and contact support.
Use a voltage detector or multi-meter
to identify
line
and
load
.
Line
will be
energized.
Turn on power at the circuit breaker.
1
2
4
3
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
Circuit Breakers
Circuit Breakers
Fuse Panel
Fuse Panel
or
or
Neutral
Wire
½”
12mm
1
2
!