This information given in good faith and is based on the latest knowledge available to InStar UK Ltd. Whilst every effort has been made to ensure that the contents of the publication
are current while going to press, customers are advised that products, techniques and codes of practice are under constant review and liable to change without notice.
InStar UK Ltd
, Holland House, Valley Way, Rockingham Road, Market Harborough, Leicestershire LE16 7PS | T: +44 (0)1858 456949 | E-mail: [email protected]
Installation Guide
Page 4
- When butting up deck boards it is recommended to use two
noggins on the sub frame. One noggin to support the end of the
first deck board and the second to support the beginning of the
next.
- The 6 x 30 mm screws for Fixego are included in the Fixego kit.
- Pre-drill with a 4 mm metal drill.
- The tightening torque is 15 on 20 for an 18 volts screwdriver.
FOR PAVING:
• Apply the rubber tape on the paving side of the aluminium
profile (ensure surface is clean and dry before application).
For best results peel off the backing strip progressively as you
apply the tape.
• Insert the spacer on the paving side of the profile.
• For a staggered tile installation, the spacers can be easily split.
• Lay the tiles.
Click
PFD
PROFILDECK ALUMINIUM SUB-FRAME SYSTEM