Minimal Tools Required

•  Tape measure

•  Level

•  Screwdriver

•   Electric mitre saw 

Also recommended:

•   A metal file

•  Chalk or line marking spray

1. Site Preparation

PFD

PROFILDECK ALUMINIUM SUB-FRAME SYSTEM

ProfilDeck® Sub-frame System 

Before starting:

•  Work out the pattern of the terrace with consideration for

•  Tile cuts

•  Spacing

•  Quantity of pedestals, junction tabs, angle brackets , profiles.

Site Preparation

•  Firstly, define the area for the installation and sweep theground 

removing stones.

•  Mark on the ground the position of the profiles using chalk or 

line marking spray. 

•  For paving installation, the distance between the profiles is 

determined by the size of the tiles.

•  Mark on the ground the position of pedestal risers, according 

the spacing guidelines, using chalk or line marking spray.

•  For paving installation, the recommended spacing is 80 cm 

between the pedestals.

•  When laying parallel profiles, ensure there is a pedestal 

underneath the connection points. The others should be placed 
at the recommended spacing.

Paving side

Decking side

Tools