Installation Guide
Page 1
CE Declaration of Performance is available on request
Minimal Tools Required
• Tape measure
• Level
• Screwdriver
• Electric mitre saw
Also recommended:
• A metal file
• Chalk or line marking spray
1. Site Preparation
PFD
PROFILDECK ALUMINIUM SUB-FRAME SYSTEM
ProfilDeck® Sub-frame System
Before starting:
• Work out the pattern of the terrace with consideration for
• Tile cuts
• Spacing
• Quantity of pedestals, junction tabs, angle brackets , profiles.
Site Preparation
• Firstly, define the area for the installation and sweep theground
removing stones.
• Mark on the ground the position of the profiles using chalk or
line marking spray.
• For paving installation, the distance between the profiles is
determined by the size of the tiles.
• Mark on the ground the position of pedestal risers, according
the spacing guidelines, using chalk or line marking spray.
• For paving installation, the recommended spacing is 80 cm
between the pedestals.
• When laying parallel profiles, ensure there is a pedestal
underneath the connection points. The others should be placed
at the recommended spacing.
Paving side
Decking side
Tools
Safety Information:
Use Protective Glasses and
Safety Gloves