Instanta UCCH1000 Installation Information & User Instructions Download Page 6

5)    WATER DISPENSE FONT:

a)      Identify the best location for the font, but take--- into consideration the final position of the under

        counter chiller unit and filter. Although we recommend that the font is located directly above the

        under-counter chiller (shortest water-path), if this is not possible there is some degree of flexibility

        and the font can be positioned up to 0.75metre either side of it.

        

NOTE: We recommend that the chiller unit is removed from its location until the counter

        top water font has been installed, giving more room to work within the cupboard space

        and also avoiding debris from cutting of holes in the counter-top dropping onto it.

b)      Cut holes in counter using paper template provided – for hole positions.

c)      Place water font into position using a thin bead of silicone sealant or similar to form a seal between

        the underside of the font and the counter-top.

d)      Secure water font to counter using 2 x M8 nuts and washers (supplied)

        IMPORTANT: Ensure electrical plug/lead from font is not trapped when fixing water font to

        counter top.

e)      Fit drain-kit (supplied) into drip-tray. Using suitable flexible tube, direct to a drain/waste.

f)       Re-position the under-counter chiller unit inside the cupboard again, aligning it with the ventilation

        openings. Fix in position to prevent the chiller from being moved inadvertently.

        To do this, secure in position using one of the fixing brackets supplied. Loosen the chiller screw

        at the front-centre, near the base, insert the bracket and replace screw. Then secure the bracket

        by driving the self tapping screw to the cabinet base.

g)      Cut the blue water-feed tube to size (if too long) and push into the “CHILLED WATER OUT”

        coupling.

        It is advisable to fit insulation to the tube between the font and the chiller unit.

h)      Plug electrical lead into socket on top of chiller unit (marked; “FONT CONTROL”).

Important: The ventilation openings must align with the cut-outs in the cabinet to ensure reliable

operation of the chiller, and the chiller should be fixed in position to prevent the chiller being moved

inadvertently.

Failure to provide sufficient ventilation and air-flow will seriously impair the performance of the chiller

and may cause overheating which will invalidate the guarantee.

6). MAINS WATER CONNECTION:

Make mains water connection to the chiller unit. It is essential that you use the WRAS approved, food

quality hose assembly c/w water purification filter.

IMPORTANT

Flush approximately 10 litres of water through the hose assembly BEFORE connecting

it to the chiller unit. This will flush any carbon particles out of the cartridge filter.

NOTE

: If your mains water pressure exceeds 4 bar (58psi), a suitable pressure reduction valve will

need to be fitted to the water supply to bring it to a level that the machine can cope with.

IMPORTANT

: We strongly recommend the fitting of a water block (flood protection).

7)     INITIAL PRIMING OF THE CHILLER UNIT:

a)      With the mains water supply connected, plug chiller unit into a 13amp socket and switch on. The

        compressor and fan will start up and the font push-button will illuminate blue.

b)      Immediately after the chiller unit has been switched on, place a container under the outlet and

Summary of Contents for UCCH1000

Page 1: ...FORMATION USER INSTRUCTIONS Instanta Limited Canning Road Southport Merseyside PR9 7SN Tel 01704 501114 Fax 01704 501115 Email info instanta com Website www instanta com Join us at www facebook com instantaltd InstantaLtd IB28a The Professional s Choice ...

Page 2: ...sed space e g kitchen cupboard Flexible water inlet hose assembly c w water purification filter NOTE An alternative ventilation kit is available from Instanta Spares Part No UCC D1 for installations within an enclosed cupboard that don t have a void space see Scenario 2 below 3 IMPORTANT INFORMATION FOR INSTALLATION The Instanta UCCH1000 Dry Chiller is designed to be fitted underneath a counter to...

Page 3: ... base of cupboard Void at back of cupboard minimum of 50mm Use TEMPLATE B to mark the opening for the exhaust air in the back of the cupboard void FRONT VENT COVER PLATE leave in place if vent kit and ducting are used as in this diagram Remove if vent kit is not being used and unit is placed on a solid floor instead Warm air expelled to avoid it being circulated within the cupboard space Use TEMPL...

Page 4: ...being recirculated within the cupboard space and therefore fulfils installation requirements SCENARIO 3 Typical installation NOT enclosed In this scenario the under counter unit is located underneath a work surface but not enclosed by a cupboard VIEW FROM ABOVE WARM AIR EXPELLED to avoid it being circulated within the cupboard space FRONT VENT COVER Remove if unit is placed on a solid COLD AIR INL...

Page 5: ...e space at the back of the cupboard and a way for the warm air to escape a 50mm void between the panel and the wall should be sufficient 3 Identify the best location for the chiller water font and filter Plan the connection to a water mains supply routing of any tubes and location of components to ensure the installation is as unobtrusive as possible 4 It is also necessary to ensure that the air i...

Page 6: ... replace screw Then secure the bracket by driving the self tapping screw to the cabinet base g Cut the blue water feed tube to size if too long and push into the CHILLED WATER OUT coupling It is advisable to fit insulation to the tube between the font and the chiller unit h Plug electrical lead into socket on top of chiller unit marked FONT CONTROL Important The ventilation openings must align wit...

Page 7: ...hiller unit at the back To adjust pull valve adjuster upwards and turn clockwise to increase pressure flow rate and anti clockwise to reduce As a guide a small cup 180ml should take approximately 5 seconds to dispense NOTE If the flow rate is faster than this the water will pass through the cooling block too quickly and the drink may not be as cool as it should be 9 TECHNICAL SPECIFICATIONS Under ...

Reviews: