![Insportline Zidaho QS8480C User Manual Download Page 10](http://html.mh-extra.com/html/insportline/zidaho-qs8480c/zidaho-qs8480c_user-manual_2069361010.webp)
10
STEP 3: Set meter tube at base frame
Set meter tube at base frame, use 2 pcs of Screw M8*20 and 2 pcs of washer, 2 pcs of Screw M8*60, 2 pcs of
washer and 2 pcs of nut to solid the meter tube (Don’t fasten screw at first)
STEP 4: Put meter on the meter tube
a)
Make sure that communication lines are connected correctly, in case they are connected in reverse.
b)
Put meter on the meter tube. Use 6 pcs of Screw M8*20 with 6 pcs of washer to solid the meter.( Don’t
fasten screw at first )
After the machine is power on, push “Start”, if everything goes well, then fasten screws mentioned in front steps.