Pulley 3
Pulley 4
Pulley 5
Pulley 6
Pulley 8
Pulley 9
Pulley 7
Pulley
10
Press Arm Upper Cable
p/n 870-500-004
STEP 9
Attach pulleys 3 and 4 to the Main Upright (2) as shown with the M10*45 bolts (94). Pulley 5 is
assembled with the Floating Pulley Plates (28) and M10*45 bolts as shown. Pulley 6 is
assembled in the corner of the Main Upright between the Top Beam Plates (22) with the M10*45
bolt as shown. Pulleys 7 and 8 are installed inside the 3” round tube of the Main Upright. Pulley
7 is above Pulley 8 and they are installed with the 1” Step Spacers (46) as shown on both sides
of the tube. Pulleys 9 and 10 are attached to the Press Arm Mount (12) as shown with the
M10*70 bolts (103). Tighten all pulley hardware now.
To route the Upper Cable (43), start by laying it out on the floor to completely unwind it. Then
fully insert the threaded end into the Top Plate of the Weight Stack. With the other end, run the
cable up and over Pulleys 3 and 4 and then down and around Pulley 5 before going back up to
Pulley 6 in the corner of the gym. After routing over Pulley 6 run the cable down through the 3”
tube and around the bottom of Pulley 8 then to the bottom of Pulley 9 in the Press Arm Mount.
Continue back through the 3” round tube to run the cable around the bottom of Pulley 7. Head
back out of the 3” round tube to the bottom of Pulley 10 in the Press Arm Mount. Go around
Pulley 10 and secure the cable end to the bracket at the top of the 3” round tube as shown using
the M10*45 bolt and the Cable End (55) with Bushing (56) and tighten the hardware.
PAGE 13
Summary of Contents for M5
Page 7: ...ASSEMBLY INSTRUCTIONS PAGE 4 ...
Page 26: ...877 738 1729 DECAL REFERENCE PAGE 23 ...
Page 27: ...DECAL REFERENCE PAGE 24 ...