
Pg. 9
V05032021
FUNCTIONAL TRAINER ASSEMBLY INSTRUCTIONS
STEP 1
A. Do not tighten the Nuts and Bolts until instructed to do so.
B. Place the Lower Cross Brace
(#4)
between the Right & Left Stations
(#1 & #2)
in the mid-span.
C. Attach one end of the Lower Cross Brace to the Right Station. Secure it with two M10 x 70 Allen Bolts
(#19)
four Ø 10
Washers
(#25)
, and two M10 Aircraft Nuts
(#24)
. Repeat the same procedure to install the other side.
D. Repeat Procedure
B & C
to install the Upper Cross Brace
(#5)
.
E. Place the Pull Up Bar Assembly
(#3)
on top of the Right and Left Stations.
F. Secure each end with two M10 x 25 Allen Bolts
(#20)
, two Ø 10 ” Lock Washers
(#23)
, and Ø 10 Washers
(#25)
.
G. Securely tighten all Nuts and Bolts installed.
Summary of Contents for 1334042
Page 2: ......
Page 6: ...Pg 6 V05032021 HARDWARE SIZING CHART ...
Page 7: ...Pg 7 V05032021 ...
Page 8: ...Pg 8 V05032021 ...
Page 11: ...Pg 11 V05032021 ...
Page 13: ...Pg 13 V05032021 DECAL PLACEMENT ...
Page 17: ......
Page 20: ......
Page 21: ...V05032022 ...