8

Grid Calibration:
It is also referred to as Non Linear Error correction (NLEC).
In  this  the  entire  measurement  area  is  divided  in  to  a  grid.  Each 
grid  cell  compensates  for  variation  with  its  own  error  correction 
coefficient. It is mandatory to set the machine reference for each 
axis before NLEC.
Specify the nominal and measured X and Y coordinates from the 
standard  during  the  setup  process.  NLEC  requires  a  repeatable 
machine zero defined on startup.

3

The changes will get saved in the memory and are applied.

The user will have to perform machine reference on every power 
ON if SLEC is selected for an axis.

Machine Reference

Here  the  Machine  reference  can  be  set  forthe  selected  axis.  The 
standard  reference  output  from  the  encoder  is  used  for  referencing. 
This  is  used  only  in  case  Segmented  Linear  compensation  is  to 
selected.

19

Summary of Contents for ISP-A5000

Page 1: ...www insize com ISP A5000 A5000E PROFILE PROJECTOR OPERATION MANUAL V0 MN ISP A5000 A5000E E MN ISP A5000 A5000E E...

Page 2: ...tility Keys 8 Numeric Function Keys 9 Coordinate And Unit Switch Buttons 10 Axis Reset Keys Point Feature key Line Feature Key Circle feature key Distance Feature Key Angle Feature Key Skew Feature Ke...

Page 3: ...tween two circles or lines 25 The surfaces of optical parts should be kept clean They should not be touched with hands If any dirt oil fleck or dust are found on the surfaces they should be removed wi...

Page 4: ...hould be located If the point is located outside the zone tolerance fails Press key then enter the nominal values for X and Y co ordinates Also enter the values for each nominal value Limits allow the...

Page 5: ...esults we must do the cross calibration process for every magnifications If we don t execute cross cal and if we probe a circle by cross hair and by edge detector in both cases we will get diameter eq...

Page 6: ...his sets the gain of the amplifier The gain depends on the magnification and the light source Adjust this such that the Screen intensity on light region displays counts above 3000 counts to 4000 In ca...

Page 7: ...to user defined segments The error in each segment is compensated with a single correction factor Each correction point is measured with respect to the starting point This starting point is usually se...

Page 8: ...the next segment by pressing Next Calibration Edit Procedure When all the segments are complete press Enter key 20 Edge Detector For ISP A1000E Optical Edge detection can be used with DRO to increase...

Page 9: ...nd measured X and Y coordinates from the standard during the setup process NLEC requires a repeatable machine zero defined on startup 3 The changes will get saved in the memory and are applied The use...

Page 10: ...ual softkey Display value will show counts of respective rotation User will enter angle of rotation in seconds Now user can calculate calibration factor by pressing calc softkey After calibration pres...

Page 11: ...t on the line and match cross hair on it Press key A Now in similar manner probe sufficient points to form a best fit line And then press key A Circle Measurement A circle can be measured by selecting...

Page 12: ...al view of results will be displayed Use up down arrow keys to move next or previous results one by one or press key to recall particular result 9 Exit from result buffer view Visible only if result i...

Page 13: ...eature measurement Also it automatically detects which geometrical shape has been probed This feature can be activated once or repeat 8 15 Skewing the job is also possible from constructed features Th...

Page 14: ...Note As shown in the above figure the part must be placed within 45 degrees of the machine s co ordinate system Procedure for skewing the job Press key Following screen will be displayed Press key to...

Reviews: