www.insigniashowers.com
Last Modified: 16/08/2021
07
What
’
s in the Boxes?
Box
Contents
Quantity
Tray
Shower Tray
Shower Roof
Bottom Rail
Top Rail
Waste + Hose
Glass Shelf
Screw Pack
Hand Shower
Shower hose
Water Valve
Accessories (see next page)
1
1
2
2
1
1
1
1
1
1
1
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
Backwalls
Left Back Panel
Right Back Panel
1
1
[ ]
[ ]
Column
Column
Upright Profiles
Magnetic Door Seals
Rear Flap Door Seals
Fixed Glass Flap Seals
1
2
2
2
2
[ ]
[ ]
[ ]
[ ]
[ ]
Glass Room
Glass Doors
Front Fixed Glass
2
2
[ ]
[ ]
VERY IMPORTANT
Have you got everything? If not please contact the Insignia directly on
01908 317 512.
Remember
NEVER
book your tradesman until everything has arrived, been checked and is
present. No replacement/missing parts can be obtained free of charge during or after the
build. Any claims can only be within the timescale permitted (48 hours after delivery) and
always
BEFORE
build.
Summary of Contents for Monochrome MC90SQ
Page 5: ...www insigniashowers com Last Modified 16 08 2021 05 ...
Page 9: ...www insigniashowers com Last Modified 16 08 2021 09 ...
Page 10: ...www insigniashowers com Last Modified 16 08 2021 10 ...
Page 15: ...www insigniashowers com Last Modified 16 08 2021 15 Step 4 Installing the Back Panels ...
Page 16: ...www insigniashowers com Last Modified 16 08 2021 16 Step 5 Installing the Upright Profiles ...
Page 17: ...www insigniashowers com Last Modified 16 08 2021 17 Step 6 Installing the Top Bottom Rails ...
Page 18: ...www insigniashowers com Last Modified 16 08 2021 18 Step 7 Installing the Front Fixed Glass ...
Page 20: ...www insigniashowers com Last Modified 16 08 2021 20 Step 9 Installing the Doors ...
Page 21: ...www insigniashowers com Last Modified 16 08 2021 21 Step 10 Installing the Roof ...
Page 22: ...www insigniashowers com Last Modified 16 08 2021 22 Step 11 Installing the Water Connections ...