www.insigniarange.com
Last Modified: 08/02/2018
11
TO START
Make sure you have a clear space, remember when finished and in place you need access to check your build and
able to pull the shower out for servicing or should you have the need to replace anything!
Take the shower tub and remove all the protective wrapping and fit the waste. In the side of the waste supplied in the
optional fitting kit you will notice a spigot not seen on an ordinary waste. In most cases this is blanked yet should you
have a steam version you need to gently drill this out as this item is for the steam generator drainage and will be con-
nected in the instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit level, adjust the tray feet
accordingly. Once you are happy with the levelling of the tray, you can pull it out to begin the main construction.
Step 1
Align the 2 back panels with the central column and fix together using the
ST20 screws
and
SW9 washers
. Once you are happy with the alignment,
remove the panels and run a bead of
silicone
up the sides and
Rubbergum
along the bottom of the column and the back panels yet
DO NOT
fix them to
the tray until
STEP 5
(please note, if your column has a rubber seal at the bottom , take the rub-
ber off and apply silicone inside the rubber and replace)