background image

                                                                                                                                                          insigniarange.com

 

Last Modified:10/10/2019

 

 12 

Step 3

 

Apply 

silicone

 to the specified area

s as shown and now fix 

 

together and screw the large back glass panel to the column using the 

ST20 

screws.

 

Step 2 

 

 

(please note, if your column has a rubber seal at the bottom , take the rubber off 

and apply 

silicone

 inside the rubber and replace)

 

 

Again, 

Once you have completed a dry run

 

and are happy, Then continue to 

apply the silicone to the specified area of the control column and place next to the 

angled back glass panel and fix together using the 

ST20 

screws.

 

Step 2

 

Summary of Contents for INS8058.1L

Page 1: ...contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __________________________ To cla...

Page 2: ...at care to ensure you get the best out of your build and have a shower that will last for many years to come OUR BADGE RATING IN TERMS OF DIFFICULTY OF ASSEMBLY IS BASED ON CLIENT FEEDBACK 1 Badge Ver...

Page 3: ...crew Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testing SUN Control Panel Instructions Help Book In...

Page 4: ...ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERTAK...

Page 5: ...ian This product comes with 13 amp plug s fitted with an RCD unit We leave it this way for you to connect this your own way due to continued additions to current regulations 1 Connect within current l...

Page 6: ...Adhesive Requirements Bacteria Resistant Sanitary Silicone for vertical joints Plumbers Mait for waste joints Not Supplied Not Supplied Hardware Requirements A Steam Shower requires 3 x 1 Metre Braide...

Page 7: ...d DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the unit apart and carry out the fin...

Page 8: ...VERY IMPORTANT Have you got everything If not please contact the Insignia Support Line on 01908 226545 Remember NEVER book your tradesman until everything has arrived been checked and is present No r...

Page 9: ...plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a combi...

Page 10: ...insigniarange com Last Modified 10 10 2019 10...

Page 11: ...ave a steam version you need to gently drill this out as this item is for the steam generator drainage and will be connected in the instructions later Now please level the tray by firstly placing the...

Page 12: ...the ST20 screws Step 2 please note if your column has a rubber seal at the bottom take the rubber off and apply silicone inside the rubber and replace Again Once you have completed a dry run and are...

Page 13: ...mage 2 Once you are happy with the alignment then continue to screw the upright into place at the top and bottom using ST14 s Please note These are not pilot holed and you will need to use the DB6 1 2...

Page 14: ...ing the ST35 screws Fix the front of the top curved rail onto the upright of the front fixed angled glass Please note in order to do this you will need to slide up the front fixed panel roughly 3 inch...

Page 15: ...holes to take the screws this is at a depth no deeper than 5mm Step 9 Apply silicone to specified area as shown on the diagram then take the front curved glass panel and insert into the upright Then u...

Page 16: ...no deeper than 5mm Step 11 Pierce through the holes using a screwdriver to show pre cut holes in the glass as indicated in the image Now using the chrome L brackets fix these to the outside of the gla...

Page 17: ...driver to show pre cut holes in the glass as indicated in the image Now repeat the process from step 11 to secure the roof to the glass panels Step 13 Align the shower roof to your side panels and whe...

Page 18: ...by tightening the grub screw situated on the bottom of the bracket Accessory Installation Tri Jet Steam System Locate the three holes in the glass panel Put the Tri Jet manifold as shown through and...

Page 19: ...be Insert the probe into the hole situated below the control panel roughly 6mm into the cabin and run clear silicone around the rear side of the probe Ozone o3 Unscrew the chrome pepper pot end and dr...

Page 20: ...d secure by tightening the inner chrome knob to the protruding inner thread Door Wheels Fit the adjustable wheels to the top and bottom of the glass doors and ensure the wheels are at their lowest pos...

Page 21: ...3 AMI Essence Filler 1 AMI04 Solenoid 1 AMI05 Brass T Piece Connector 1 AMI06 Straight Pipe Connector 1 AMI07 Battery Box Inc Velcro 1 AMI08 Electrical Connection Cable 1 AMI09 Cable Mount Clips 2 AMI...

Page 22: ...exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and loosening the grub screw please ensure not to unscrew full...

Page 23: ...igniarange com Last Modified 10 10 2019 23 Electric Box Connections Connect the cables below to the corresponding devices on the shower Roof Light Speaker Antenna Thermostatic probe Power Supply Speak...

Page 24: ...eam system within your shower Make sure these are fitted in the correct position as they are only attached for transportation reasons only Water Inlet Connect a braided hose from the shower valve s ce...

Page 25: ...s shown below Follow the lights around in the order shown as this allows a consistent path around the entire roof and will leave you placing the last light next to the first light This is important as...

Page 26: ...s not to be used for washing bathing animals Always turn power supply off after use Always turn water supply off after use Safety precautions Never leave children unattended in the shower or bath Neve...

Page 27: ...g from one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the ar...

Page 28: ...ctivated Other buttons will remain functional whilst in this state of lock mode Button 5 Music Press once for FM Radio and press twice for Bluetooth For tuning radio stations or connecting Bluetooth p...

Page 29: ...p 1 To tune your radio channels firstly press the music function button which looks like a musical note Tuning your radio channels Step 1 To connect a device via Bluetooth press the music function but...

Page 30: ...insigniarange com Last Modified 10 10 2019 30 Need Help If so then simply download Insignia s free comprehensive help and troubleshooting brochure now Simply visit www insigniarange co uk help aspx...

Page 31: ...ately 4 meters of U Style seals SP040 Horizontal Steam Generator SP241 DX 310 Water Pump SP052 Whirlpool pump switch SP059 Air valve operation switch SP098 Chrome air jet SP300 Waste hose SP301 White...

Page 32: ...insigniarange com Last Modified 10 10 2019 32 Bathroom Electrical Zones...

Page 33: ...m goes past zones 0 1 and 2 portable electrical appliances can be utilised if their cord length doesn t allow them to be used in zone 2 For example a hairdryer can be used in the outside zones provide...

Page 34: ...on crossed out wheelie bin label We accept returns of all products carrying the Insignia brand All other products are either considered outside the scope of WEEE or Insignia is not technically the pro...

Page 35: ...onal Ltd All images are subject to copyright Images may not be used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or...

Reviews: