background image

 

www.insigniarange.com

 

Last Modified: 19/06/2017

 

 22 

Silicone Seal (vertical joints)

 

-

 

RubberGum (horizontal joints)

 

 

TESTING FOR WATER LEAKS

 

LEAVE THE SHOWER 24 HOURS AFTER BUILD TO ALLOW SEALENT TO CURE AND 

ENSURE THE SHOWER IS AWAY FROM ITS FINAL POSITION TO ALLOW REAR VIEWING

 

Ensure all connections are tight and sealed including the waste, body jets and steam outlet 

(model dependent) on your shower.

 

Switch on the overhead shower NOT the massage jets, remember these will fire water out at you 

and are not suitable for checking leaks as they would normally only operate when a person is in 

front of them. DO NOT AIM THE HAND SHOWER AT THE JOINTS OF YOUR SHOWER AS 

THIS DOES NOT FALL UNDER 

NORMAL EVERYDAY USE

”. 

Adjust the feet to ensure the  

direction of the water flows towards to the waste to prevent puddling.

 

Just use COLD water setting as hot will make cabin misty and condensate thus the inspection 

becomes very difficult. Now on the OUTSIDE of the shower inspect each joint, factory seal, hose, 

clip and jet by walking from one side and going around to the back and then to the other side 

finishing at the front. If you have a small leak (normally caused through insufficient sealer or air 

bubble on assembly, dry the area thoroughly and reseal.

 

Please remember the location of the water may not be exactly where the leak is as it could have 

run around to a low point. Never seal your inner fittings unless necessary, remember you will see 

this for the life of the shower! Again leave to cure and check. Once you are happy check the 

shower functions i.e. jets for back massage, foot massage and finally hand shower (model 

dependent) check your joints to these functions at the rear again. Never use the shower until 

all

 

checks have been made and the installer is 100% happy in the knowledge no leaks are present. 

 

Important Note:

 

 

 

It is not uncommon due to temperature changes, 

 

glass seals fitted into the 

frame lower horizontal and sides can and do shrink leaving a small gap. This is normal to prevent 

rubbers perishing or opening later in your showers life. Check yours now, any slight gaps simply 

seal neatly with a thin bead of silicone. This will prevent chances of leakage both now or later in 

life. 

 

All good?

 

Now push your shower FROM THE BASE and NEVER THE GLASS OR FRAME into its final 

resting position.

 

Happy Showering! 

Summary of Contents for GT5000R

Page 1: ...ts Parts inside of your warranty contact www insigniarange co uk customerservice aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO _...

Page 2: ...irements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testing MK117U Contro...

Page 3: ...ny years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your f...

Page 4: ...D ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERT...

Page 5: ...d two methods 1 Connect within current laws and IP directives using plug and RCD provided with steam version or supply one for non steam version 2 Preferred Wire into isolated fused feed connecting di...

Page 6: ...cone Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints Not Suppli...

Page 7: ...he unit is assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build t...

Page 8: ...replacement missing parts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code D...

Page 9: ...r plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a comb...

Page 10: ...www insigniarange com Last Modified 19 06 2017 10...

Page 11: ...you need to gently drill this out as this item is for the steam generator drainage and will be con nected in the instructions later Now please level the tray by firstly placing the tray in its final...

Page 12: ...nment run a bead of silicone up the edge and apply Rubbergum along the bottom of the pan el and screw together using the ST20 Step 3 Front Fixed Uprights PLEASE NOTE The uprights have small grooves cu...

Page 13: ...picture to the left PLEASE NOTE The screw head needs to bypass the OUTER hole If this does not occur please bore out the outer hole only by about 2 4mm Your front metal work should now look like this...

Page 14: ...ge of the curved and the straight fixed glass panels and cut any excess of if required Step 4 Now attach your front metal work to the fitted back panels Once you are happy with the alignment run a bea...

Page 15: ...s per the arrows in the adjacent image Making sure the edge of the glass with the rubber seal fits into the grove tightly Now screw the glass retaining clips into place using the ST14 screws making su...

Page 16: ...tom of the glass doors and ensure the wheels are at their lowest position and hang on the inner curved rails with the wheels facing theoutside of the glass Once all wheels are fitted and on the rails...

Page 17: ...cient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes Steam Pod Insert the pod from the inside of the shower and attach large white nut from the re...

Page 18: ...crew the chrome pepper pot end and drop the white box upside down into the rear hole as shown in the image Now from the inside of the shower re attach the chrome pepper pot end and tighten Monsoon Hea...

Page 19: ...reference point IF YOUR DIAL DOES NOT CORROSPOND TO THE APPROPRIATE DEVICE Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevan...

Page 20: ...www insigniarange com Last Modified 19 06 2017 20 Electric Box Connections Bluetooth USB Phone Connection This feature if fitted has now been disabled Please do not connect as it will not work...

Page 21: ...shower Make sure these are fitted in the correct position as they are only attached for transportation reasons only Water Inlet Connect a braided hose from the shower valve s centre feed to this open...

Page 22: ...back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the area thoroughly and reseal Please remember...

Page 23: ...lease ensure you have switch off the Bluetooth to any current paired devices as only one connection can occur at any one time Note The device you are looking to pair is either INSIGNIA or SPR OUT Butt...

Page 24: ...contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves...

Page 25: ...Massage jet 2 open ends SP048A Massage jet 1 open 1 closed SP123 Shower Holder SP216 Shower waste SP097 Chrome rectangular door handles SP240 Glass Shelf SP058 Skirt light SP058A End skirt light SP19...

Page 26: ...used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All...

Reviews: