background image

Orienting the device

1.  Run the PoE cable to the desired location of the PoE injector and insert the cable 

into the 

Data & Power Out 

port on the PoE power injector.

 

2.  Take a racheting socket wrench and device/ smartphone with the Inseego Mobile 

App to the FW2010e location. 

3.  Use the Inseego Mobile App and the positioning bolts on the wall mount bracket 

to fine tune the horizontal and vertical angle of the FW2010e for the best signal. 

4.  Tighten both sets of positioning bolts to 15.0 Nm (11 ft/lb). 

17

Summary of Contents for Wavemaker PRO

Page 1: ...Installation Guide Inseego WavemakerTM PRO 5G Outdoor CPE FW2010e PN 14945407 Rev 2...

Page 2: ...or and SIM tool NOTE Mount installation packages are ordered and shipped separately Power over Ethernet 2 About the FW2010e Description The 5G Outdoor CPE FW2010e delivers multi gigabit data rates ove...

Page 3: ...ano 4FF SIM card into the appropriate SIM slot Be careful to not use excessive force 3 Reattach the protective shield cover to a torque of 0 49 Nm 0 36 ft lb making sure the tether passes through the...

Page 4: ...ing diagram 4 For ease of carrying during the location survey attach the installation handle to the back of the device with a Phillips head screwdriver a Unscrew the PoE gland cap assembly b Thread th...

Page 5: ...aling into the gland body e Slide the clip and the sealing cap along the cable and screw the sealing cap tightly to the gland body The sealing cap will keep the PoE connection secure and watertight f...

Page 6: ...lts and washers 4 Square neck bolt Location survey 1 Scan the QR code to download the Inseego Mobile App from Apple Store or Google Play Store or visit https inseego com inseego connect get app to dow...

Page 7: ...river to tighten the bolts to 2 0 Nm 1 48 ft lb 3 Place the M6 external locking washers on the M6 21mm bracket mount bolts Attaching the FW2010e to the device elevation bracket 1 Remove the installati...

Page 8: ...unt is adjustable and can be mounted on vertical horizontal and slanted exterior surfaces The mount is attached using the four roof mount lag screw in the corners of the base Attaching the device to t...

Page 9: ...tphone with the Inseego Mobile App to the FW2010e location 3 Use the Inseego Mobile App and the positioning bolts on the device elevation bracket and bottom of the mount to fine tune the horizontal an...

Page 10: ...bracket Zenith bracket Holes for M6 21mm bracket mount bolts and washers 4 Washer 4 Assembling the pole mount bracket 1 Attach the azimuth bracket to the zenith bracket using the four hex flange head...

Page 11: ...nstallation handle and unplug the PoE cable from the PoE injector 2 Attach a ground wire to the back of the device with the ground screw 3 Place the M6 external locking washers on the four M6 21mm bra...

Page 12: ...pole 1 Place the device against the pole 2 Slide the U bracket onto the M10 carriage bolts and secure with external locking washers washers and M10 hex nuts tightened to 4 0 Nm 2 95 ft lb 3 Secure the...

Page 13: ...App and the positioning bolts on the pole mount bracket to fine tune the angle of the FW2010e for the best signal 4 Tighten the positioning bolts to 15 0 Nm 11 ft lb Orienting the device 1 Run the Po...

Page 14: ...h PEM nuts zenith to azimuth bracket 4 Hex flange head bolts with PEM nuts azimuth to wall bracket 4 Hole for hex flange lag bolts 4 Assembling the wall mount bracket 1 Attach the azimuth bracket to t...

Page 15: ...the installation handle and unplug the PoE cable from the PoE injector 2 Attach a ground wire to the back of the device with the ground screw 3 Place M6 external locking washers on four M6 21mm bracke...

Page 16: ...2 Secure the ground wire to an appropriate earth ground Securing the device to the wall 1 Use four hex flange head lag bolts to attach the wall bracket to the wall 16...

Page 17: ...ower injector 2 Take a racheting socket wrench and device smartphone with the Inseego Mobile App to the FW2010e location 3 Use the Inseego Mobile App and the positioning bolts on the wall mount bracke...

Page 18: ...vice monitoring and management FW2010e Admin Web UI Access the Web UI at http 192 168 1 1 for a full set of device management features The initial sign in password is Fast5G Inseego Connect Go to conn...

Page 19: ...Pinout configuration and permissible power supply polarity PoE RJ45 fitting cable wiring diagram The recommended PoE cable is Cat6A with T568B on both ends 19...

Page 20: ...ot function 5G Not all devices signals or uses are compatible check device specifications See your service provider s website for 5G coverage access and network management details Information about sa...

Reviews: