![Inscape Data Link Power LPS2800-T1 Series User Manual Download Page 5](http://html1.mh-extra.com/html/inscape-data/link-power-lps2800-t1-series/link-power-lps2800-t1-series_user-manual_2065281005.webp)
Page | 5
Product Description
LPS2800-T1 Series Outdoor Industrial PoE Switch features with four PoE Ethernet ports and comply to
10/100/1000BaseT(X), IEEE802.3af/at PoE and two RJ45 and four Gigabit SFP fiber optics uplink
interfaces. Each of the PoE ports supplies DC power up to 15.4W for 802.3af and 25.5W for 802.3at. The
transfer data is up to 120Km from SFP fiber port to a control center. Additionally, the product also
features with an anti-electromagnetic interference designed for harsh outdoor applications, and the
3KV network port surge protection adapts to harsh outdoor environment and ensures the reliability of
the uninterrupted PoE operations. The system is rated at IP68, and the system is able to operate under -
40˚ ~ +75˚ C temperature range.
Product Features
1.
The system supports
DUAL POWER INPUT REDUNDANCY
2.
Comply to IEEE 802.3, IEEE 802.3u, IEEE 802.3z, IEEE 802.3ab, IEEE 802.3x, IEEE 802.1D, IEEE
802.3at, IEEE 802.3af, IEEE 802.1Q IEEE 802.1p, IEEE 802.1x, IEEE 802.1W, SNMP, IGMP
standards
3.
10/ 100/ 1000M self-sensing RJ45 port, support PoE power supply f unction; All ports support
auto-flip (Auto MDI/MDIX);
4.
Each PoE port can provide power up to 15.4W p er IEE E 802.3af standard and 30W per
IEEE802.3at standard; Supply power for powered devices compatible with IEEE802.3af/at;
5.
Support IEEE802.3x full duplex flow control and duplex backpressure flow control;
6.
8.8G backplane bandwidth;
7.
1K MAC address table;
8.
Its 3KV network port surge protection can adapt to harsh outdoor environment; Under the
temperature of -40˚ ~ +75˚ C, working at a full load 150W for IEEE802.3af and 225W for
IEEE802.3at;
9.
The four gigabit SFP fiber ports are capable of high bandwidth and for up to 120KM long
distance transmission.
Installation
a.
Before installation, please ensure the following:
1)
All PD devices, i.e., PoE Clients, meet the power requirement of the connecting devices.
2)
All PD devices, i.e., PoE Clients, match with the power receiving device power pinout
specification (1/2+ & 3/6-)
b.
Connect the power cable to a power source, 110 ~ 240V AC. Note, 48V DC is optional and can be
used as the backup power. Then, the switch will automatically initialize, and LED lights status will
display as following:
i.
Except the POE port lights, all the other lights will go through the process of “on-off-on-
off”, which means the installation is successful.
ii.
Power LED remains ON
c.
Connect the network devices with network cables to the POE switch port though the waterproof
connectors, then secure the Top Cover with the four screws to the Bottom Case
d.
After the Ethernet and/or fiber optics network devices are connected, please refer the LED
Indicator Description Table Below on Page 6
Control Panel Diagram
Summary of Contents for Link Power LPS2800-T1 Series
Page 8: ...Page 8...
Page 10: ...Page 10...