SS-GM-02 Owner’s Manual
Document: OM-236 Version Code: A
Date: May 06, 2020 Date: Feb 05, 2021
© Copyright 2021 InPower LLC
Page
7 of 8
InPower LLC
8311 Green Meadows Drive
Lewis Center, Ohio 43035 USA
740-548-0965
www.InPowerLLC.com
PTO Upfitter Connector Location
Suggested Mounting
Location for SS-GM-02
PTO Upfitter
Connector
2.5 Making the Control Connections
First, unplug the plug from the PTO Upfitter Connector, and plug the SS-GM-02
Harness P1 Connector into the PTO Upfitter Connector. Next, Plug P2 of the harness
into the SS-GM-02 Start/Stop Controller.
Next, with the appropriate connectors for your PTO type, route the Group 3 wires from
the P1 Connector to the PTO and connect the PTO-CTL and GND (PTO Control and
Ground connections) to the PTO. Then, with the appropriate connector for your PTO,
connect the PTO-FB and +12V (Feedback signal (Pressure) and Power) to the PTO.
This will insure that there is proper Control and Feedback from the PTO to the SS-
GM-02 Start/Stop Controller and PTO Controller.
Following the connections to the PTO Upfitter Connector (P1) and SS-GM-02 (P2), the
Group 1 signals must be appropriately Terminated for Start/Stop and RPM Selection
selection. Connect the Group 1 Wires in appropriate manner for your application.
1.765
3.865
3.2
0.71
1.175
1.065
0.065
1.065
.362
All Dimensions in Inches
Do not scale
Use #10 Mounting Screws
HI-OUT
+12V
GND
IN1
IN2
GND
J
IN3
PTO-CTL
A
IN4
VAUX
PTOR
CH3
CH2
1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17 18 19 20
Not Used
Not Used
Not Used
Not
Used
3.0 Mechanical
0.83
1.52