background image

 Page 5

EN

Chapter 1 General information

EN

Page 4

1 General information

1.1 Information about this manual

•  This manual helps to ensure safe and efficient use of 

the machine.

•  Operating personnel must have carefully read through 

and understood this manual before starting any work.

•  Compliance with all the specified safety instructions is 

a basic prerequisite for working safely.

•  This manual is a component of the machine and must 

be stored within direct proximity of the machine, acces-
sible to operating personnel at all times.

•  In addition to the notices in these instructions, the local 

accident prevention guidelines and national occupa-
tional health regulations also apply.

1.2 Symbol explanation 

Hazard notices feature symbols to make them easier to 
identify. These indicate the severity of the hazard.
•  You must observe this information.

!

DANGER

  DANGER 

indicates an immediate hazard. 

Death or serious injuries may result from non-compliance.

!

WARNING

  WARNING 

indicates a potentially dangerous 

situation. Death or serious injuries may result from a failure 
to avoid these situations. 

!

CAUTION

  CAUTION 

indicates a potentially dangerous 

situation. Minor or slight injuries may result from failure to 
avoid these situations or damage to the machine or some-
thing in its vicinity.

NOTE

 

NOTICE

 draws your attention to useful tips for 

effectively handling the machine.

1.3 Information about this manual

1.3.1 Purpose of this operating manual

The operating manual is used to provide information to the 
operating manager, assembly fitters and machine operators 
on the construction site. It contains important instructions 
for safe use, optimum results and a long service life.

!

DANGER

  Risk of incorrect operation

Failure to observe the operating manual could put the 
operator’s life and health at risk and damage the ma-
chine.

•  Read this operating manual carefully before passing it 

on to your assembly fitters or operators.

•  Please ensure that assembly fitters and operators read 

this operating manual carefully before they start install-
ing and commissioning the machine.

•  Always keep the operating manual to hand and in a leg-

ible condition.

1.3.2 Disclaimer

All technical information, data and instructions for use con-
tained in this operating manual reflect the state of the art at 
the time of printing and are based on our experience thus 
far and the best of our knowledge.
The manufacturer cannot be held liable for any damages as 
a result of:
•  Failure to comply with this manual
•  Improper use
•  Assignment of non-trained personnel
•  Unauthorised alterations
•  Technical changes
•  Use of non-approved spare parts

1.3.3 Warranty

Statutory warranty periods of 12 months from the date of 
purchase/the date of invoice of the industrial end customer 
apply to our machinery.

1.3.3.1 Exercising claims

In the event of a warranty claim, send the entire machine, 
along with the invoice, to our headquarters in Wald-
shut-Tiengen.
Contact our free INOTEC service
hotline beforehand on +49 7741 6805 777.

4.8.5 Mixing pipe cover for mixing pipe (item no. 10039950)................................................................................................17
4.8.6 Mixing shaft for mixing pipe (item no. 10039948) ........................................................................................................17
4.8.7 Drive unit (item no. 10039958) ....................................................................................................................................18

5 Transport and storage ............................................................................................................................. 19

5.1 Safety notices for transport ............................................................................................................................19
5.2 Transport inspection ........................................................................................................................................19
5.3 Damage report .................................................................................................................................................19
5.4 Complaints .......................................................................................................................................................19
5.5 Packaging .........................................................................................................................................................19
5.6 Transport of the used machine in vehicle ......................................................................................................19
5.7 Storage .............................................................................................................................................................19

6 Installation ............................................................................................................................................... 20

6.1 Delivery condition of the machine .................................................................................................................20
6.2 Connecting the metering shaft and motor ....................................................................................................20
6.3 Assembling the mixing pipe and mixing shaft ..............................................................................................20
6.4 Connecting the electrical control system .......................................................................................................21
6.5 Installing the water measuring system ..........................................................................................................21

7 Commissioning  ....................................................................................................................................... 22

7.1 Adding material to the material hopper ........................................................................................................22
7.2 Opening and emptying bags of material .......................................................................................................22
7.3 Commissioning inoMIX S16 ............................................................................................................................22
7.4 Function after commissioning ........................................................................................................................22
7.5 Changing material ...........................................................................................................................................22
7.6 Change of location on the construction site .................................................................................................22

8 Operation, use .......................................................................................................................................... 23

8.1 Checking operating performance ...................................................................................................................23
8.2 Checking the consistency of the material ......................................................................................................23
8.3 Correcting flow fluctuations ...........................................................................................................................23
8.4 Work break .......................................................................................................................................................23
8.5 End of work ......................................................................................................................................................24

8.5.1 Switching off the machine ...........................................................................................................................................24
8.5.2 Dismantling and cleaning the mixing pipe and mixing shaft..........................................................................................24
8.5.3 Dismantling the motor und metering shaft ...................................................................................................................24

9 Cleaning and decommissioning ............................................................................................................. 24

9.1 Cleaning process ..............................................................................................................................................24
9.2 After cleaning ..................................................................................................................................................25
9.3 Decommissioning .............................................................................................................................................25

9.3.1 Running the machine until it is empty and switching it off ............................................................................................25
9.3.2 Mixing pipe and mixing shaft with mixing pipe cover ...................................................................................................25
9.3.3 Water measuring system ..............................................................................................................................................25
9.3.4 Dismantling the motor and metering shaft ...................................................................................................................25

10 Maintenance ........................................................................................................................................... 26

10.1 Maintenance plan ..........................................................................................................................................26
10.2 Dirt trap sieve in the water inlet ..................................................................................................................26
10.3 Dirt trap sieve in the pressure reducing valve .............................................................................................26
10.4 Wear limit for metering shafts .....................................................................................................................27
10.5 Wear limit for mixing shafts .........................................................................................................................27

11 Faults, causes and solutions ................................................................................................................. 27

12 Dismantling and disposal ..................................................................................................................... 29

12.1 Safety ..............................................................................................................................................................29
12.2 Dismantling ....................................................................................................................................................29
12.3 Disposal ..........................................................................................................................................................29

13 Systems ................................................................................................................................................... 30

13.1 EC declaration of conformity ........................................................................................................................30
13.2 General Terms of Business of the company INOTEC GmbH ........................................................................31
13.3 Circuit diagram for inoMIX S16  ...................................................................................................................32

14 Order form .............................................................................................................................................. 33

15 Index ....................................................................................................................................................... 34

16 Locations ................................................................................................................................................ 35

Summary of Contents for 10039462

Page 1: ...EN Read this entire original operating manual before starting work Original Operating Manual inoMIX S16 continuous mixer...

Page 2: ...d maintaining the machine 7 2 2 5 Changing the location of the machine 7 2 3 Notices on the machine 8 2 4 Personnel qualification 8 2 5 Responsibility of the operator 8 2 6 Personal protective equipme...

Page 3: ...ges as a result of Failure to comply with this manual Improper use Assignment of non trained personnel Unauthorised alterations Technical changes Use of non approved spare parts 1 3 3 Warranty Statuto...

Page 4: ...ure the machine against unexpectedly being switched back on WARNING Water jet Risk of injury and risk of property damage due to es caping water 1 Interrupt the external water supply by closing the wat...

Page 5: ...hed to the machine Always keep the safety and hazard notices in a clearly legible condition Safety notice to the right of the GEKA coupling Safety notice under the rating plate 1 QR code on the motor...

Page 6: ...mesh toothed rail and metering shaft 4 3 1 2 Control system Connect the main switch to the external power supply 230 V 50 Hz The cross section of the supply cable must be at least 2 5 mm2 The inoMIX...

Page 7: ...4 5 Motor DANGER Electrical voltage Danger of death due to electric shock 1 Work on the electronic control system may only be per formed by a qualified electrician 2 Switch the machine off To do this...

Page 8: ...ieve insert 6 10006470 2 Units Hose nozzle 1 2 ET x 13 mm nozzle 7 10021968 1 0 Meter Black rubber water hose 1 2 with yellow stripes 8 10006471 1 Units Angular 1 2 90 galvanised IT 9 10022443 2 Units...

Page 9: ...Units Complete mixing pipe cover 5 10017068 2 Units Eccentric lock size 0 with drawbar eye 6 10036239 1 Units Clamping plug G1 2 for plastic mixing pipe 7 10022373 1 Units GEKA coupling 1 2 ET 4 8 5...

Page 10: ...eed as follows in the event of externally visible transport damage 1 Write a damage report with the following details Your client address Name of the transport company and the driver Date and time of...

Page 11: ...e DANGER Rotating shaft Danger of death due to being pulled into the machine and crushed When the motor is running the metering shaft ro tates even if the mixing pipe has been removed with the mixing...

Page 12: ...and a han dle is attached to the hopper The mixer can therefore be moved on the construction site easily Its mixing pipe can also be used to lift and move the inoMIX S16 around To do this disconnect t...

Page 13: ...ve the supply and cleaning hose from the water valve 13 Remove the motor by opening the quick release fasten er that connects the motor to the main frame 14 Pull out the metering shaft from the main f...

Page 14: ...d Maximum height of mixer blades 55 mm Wear limit Minimum height of mixer blades 50 mm 11 Faults causes and solutions The inoMIX S16 is designed for fault free operation How ever should a fault occur...

Page 15: ...ted properly Check whether the mixing shaft is connected to the metering shaft Machine operator Material consistency too thick The amount of water supplied is too low Increase the flow volume by adjus...

Page 16: ...m for damages is asserted INOTEC GmbH may demand compensation at the amount of 15 of the purchase price without being required to provide evidence to compensate for lost profit The contracting parties...

Page 17: ...very address Invoice to Name of customer Consultant Date Number Item no Item name Our General Terms of Business Delivery and Payment apply The customer has been made aware of these terms and agrees to...

Page 18: ...on 20 Installation location requirements 20 Installing the water measuring system 11 Intended use 6 L Legal notice 2 Locations 35 M Maintenance 26 Maintenance plan 26 Material hopper 9 Metering shaft...

Page 19: ...ct range Delivery pumps Mixing pumps Mixers Delivery systems OWC technology Silo technology Airless devices Cutters Grinders One handed guns Accessories spare parts Waste water systems Tillage Power t...

Reviews: