INNOVATIVEGROWERSEQUIPMENT.COM
Call 815-991-5010 or email us at sales@innova
Ɵ
vegrowersequipment.com if you have any ques
Ɵ
ons
EBB & FLOW BENCH TRAY GLUING INSTRUCTIONS
STEP #1
Lay trays out per included drawing. Trays should have roughly a
1/8” gap, there is a planned air gap in the end to allow for expan-
sion. Make sure all trays are si
ƫ
ng level before moving on to the
next step.
STEP #2
Place glue tube (A7) in caulking gun and
cut open end (before screwing on nozzle)
to prepare to glue.
Addi
Ɵ
onal glue availabel for purchase at
innova
Ɵ
vegrowersequipment.com online store.
GLUING INSTRUCTIONS
DO NOT GLUE IN BETWEEN THE TRAYS
͵
ONLY GLUE ON TOP OF SEAM
WHEN TRAYS MEET
ͳ
SHOWN IN PICTURE
Caulk Gun
TOOLS NEEDED FOR ASSEMBLY
Razor/Knife