background image

EBB & FLOW BENCH ASSEMBLY INSTRUCTIONS 

Complete Instruc

Ɵ

onal Guide

INNOVATIVEGROWERSEQUIPMENT.COM

Call 815-991-5010 or email us at sales@innova

Ɵ

vegrowersequipment.com if you have any ques

Ɵ

ons

7/16

” WRENCH

7/16

” SOCKET

LEVEL

POP RIVET TOOL

TAPE MEASURE

WE RECOMMEND AN IMPACT 
GUN FOR LARGER JOBS

POWER DRILL

Έ

FOR BENCHES LARGER THAN 5’

Ή

WE RECOMMEND A 
PNEUMATIC RIVETER FOR 
LARGER QUANTITIES

MALLET

CAULK GUN

TOOLS NEEDED FOR ASSEMBLY

Level

Mallet

Pop

Riveter

Caulk Gun

Summary of Contents for EBB & FLOW

Page 1: ...les innovaƟvegrowersequipment com if you have any quesƟons 7 16 WRENCH 7 16 SOCKET LEVEL POP RIVET TOOL TAPE MEASURE WE RECOMMEND AN IMPACT GUN FOR LARGER JOBS POWER DRILL ΈFOR BENCHES LARGER THAN 5 Ή WE RECOMMEND A PNEUMATIC RIVETER FOR LARGER QUANTITIES MALLET CAULK GUN TOOLS NEEDED FOR ASSEMBLY Level Mallet Pop Riveter Caulk Gun ...

Page 2: ...IPE INSERT ΈONLY USE ON BENCHES OVER 27 FTΉ ΈA12Ή SCREEN FOR BULKHEAD FITTING ΈB2Ή HEADER ΈE1Ή END FRAME ΈONLY USE ON BENCHES OVER 5 FTΉ ΈB3Ή BENCH CROSSBAR ΈA13Ή 3 4 BULKHEAD FITTING ΈB1Ή LEGS ΈLEG SUPPORTSΉ ΈA10Ή SIDE RAIL JOINER PLATE ΈONLY USE ON BENCHES OVER 24 FTΉ ΈA6Ή 1 4 ͳ 20 BOLT NUT ΈA7Ή BENCH GLUE ΈA8Ή BENCH FILTER ΈA2Ή POP RIVET ΈA3Ή FLAT WASHER ΈA4Ή LOAD BEARINGPLUG ΈA11Ή TEK ΈSELFͳTA...

Page 3: ...om if you have any quesƟons BENCH TRAYS PARTS INCLUDED WITH MAX ROLL TABLES CONFIRM ALL PARTS ARE PRESENT BEFORE STARTING INSTALLATION TRAY GLUE IS USED TO SEAL TRAYS TOGETHER ΈA7Ή ΈS1Ή ANITͳTIP MAX ROLL HEADER ΈS2Ή TAP CON SCREWS ΈS3Ή SAFETY CHAINS ΈS4Ή LͳBRACKET END TRAY ΈWITH DRAIN MOLDINGΉ END TRAY MIDDLE TRAY FOR LONGER BENCHESΉ ...

Page 4: ...1 on end ridged end up as shown in Figure 1 and rest the end of the stringer pipe on the bar connecƟng the two leg ends Please go to InnovaƟve Growers Equipment youtube page if you need further instrucƟons on this INNOVATIVEGROWERSEQUIPMENT COM Call 815 991 5010 or email us at sales innovaƟvegrowersequipment com if you have any quesƟons FOLLOW INSTRUCTIONS BELOW ΈCONT Ή FIGUIRE 1 ...

Page 5: ...n the nuts A6 from the inner porƟon of the frame as shown in Figure 2 STEP 4 Perform the same steps on the other end of the leg support shown You ll now have one end of the bench standing as shown below on Figure 3 Inside Clamp PosiƟon Outside Clamp PosiƟon INNOVATIVEGROWERSEQUIPMENT COM Call 815 991 5010 or email us at sales innovaƟvegrowersequipment com if you have any quesƟons FOLLOW INSTRUCTIO...

Page 6: ...e the diagrams aƩached for reference They will provide spacing requirements STEP 6 Once the legs are all standing you can insert the load bearing plugs A4 into the boƩom of all the welded legs B1 see Figure 5 Also install them to the ends of the stringer pipes on each corner of the frame shown on Figure 6 INNOVATIVEGROWERSEQUIPMENT COM Call 815 991 5010 or email us at sales innovaƟvegrowersequipme...

Page 7: ...n the bolts of the pre assembled headers B2 and slide the bolts through the opening of the crimped end of the leg supports B1 shown on Figure 7 STEP 8 FOR MAX ROLL TABLES ONLY If you have a max roll table insert your max roll head ers S1 into legs B1 like you would regular headers Figure 8 The locaƟon for these headers will be labeled on your aluminum side rails as well as your custom bench diagra...

Page 8: ... BELOW ΈCONT Ή STEP 9 FOR MAX ROLL TABLES ONLY Now take the rolling pipe and slide them through the opening of the swinging bar aƩached to the anƟ Ɵp S1 on one end of the table and push it through the opening at the other end of the table see Figures 9 10 11 Note if the bench is over 24 you will have swedged pipe to connect to addiƟonal rolling pipe FIGUIRE 9 FIGUIRE 10 FIGUIRE 11 ...

Page 9: ... BELOW ΈCONT Ή STEP 10 Next take the end frames E1 and lay them across the rolling pipe on each of the table Figure 12a and Figure 12b STEP 11 Lay out the bench cross bars B3 over the rolling pipe equally spaced across the bench as shown in Figures 13a 13b Be sure the pre punched holes are FACING UP when they re laid across the bench FIGUIRE 12a FIGUIRE 12b FIGUIRE 13a FIGUIRE 13b ...

Page 10: ... rivets A2 Figure 14a shows one of the bench corners before its connected to the aluminum end piece with the pop rivets in the holes Figure 14b shows what the rivets should look like aŌer they ve been riveted Figure 14c shows what both end aluminum rails should look like aŌer all the bench corners have been riveted to them Figure 14d shows the bench rails and corners connected NoƟce the bench corn...

Page 11: ...rt the bench cross bar B3 ends into the slot lined along the aluminum piece On benches 5 or wider you will have to connect the end frames E1 as well see Figure 15 and Figure 16 NOTE Make sure the pre drilled holes are posiƟoned upward on the bench cross bars and end frames NoƟce the posiƟon of the end frames on Figure 18 Again end frames will only be used for benches 5 or wider FIGUIRE 18 FIGUIRE ...

Page 12: ... side rail to bench cross bars B3 in the pre punched and pre drilled holes using the pop rivets A2 Repeat this on the other side of the table See Figures below For benches over 24 Insert side rail joiner plates A10 into the two matching sides of aluminum see Figure 21 and Figure 22 Refer to your custom diagram provided along with these instrucƟons for the side rail locaƟons FIGUIRE 19 FIGUIRE 20 F...

Page 13: ...BENCHES INNOVATIVEGROWERSEQUIPMENT COM Call 815 991 5010 or email us at sales innovaƟvegrowersequipment com if you have any quesƟons FOLLOW INSTRUCTIONS BELOW ΈCONT Ή STEP 15 Now rivet the end aluminum pieces with corners A5 to the aluminum sides ...

Page 14: ...f the alumi num side Keep in mind there are no pre drilled holes on this end and you will have to use a power drill to drive through the aluminum and end frame see Figure 23 STEP 17 Now you can lay the plasƟc trays onto the bench Lay the piece of plasƟc with the indented lip onto the bench first see Figure 24 You can follow the customer diagram provided or use the markings on the aluminum side rai...

Page 15: ...ew the safety chains S3 into all legs with anƟ Ɵp headers S1 Figure 25 on them You ll want to use the tek screws A11 and verify the chain is stretched Ɵght before screwing in both ends of the chain see Figure 26 FOR MAX ROLL TABLES ONLY Place 2 of these L brackets S4 on each leg that has an AnƟ Ɵp header S1 Use provided tek screws A11 and insert two tek screws in the bench leg Then use the provide...

Page 16: ...d air gap in the end to allow for expan sion Make sure all trays are siƫng level before moving on to the next step STEP 2 Place glue tube A7 in caulking gun and cut open end before screwing on nozzle to prepare to glue AddiƟonal glue availabel for purchase at innovaƟvegrowersequipment com online store GLUING INSTRUCTIONS DO NOT GLUE IN BETWEEN THE TRAYS ONLY GLUE ON TOP OF SEAM WHEN TRAYS MEETͳ SH...

Page 17: ...Ɵc or metal pipe to smooth glue in main drainage channel making sure there is a seam sealed on both ends and no large globs blocking water flowage You may have to repeat these 1 or 2 Ɵmes aŌer a few minutes DO NOT Smooth glue on the top of the gap let it seƩle by gravity only smooth glue in the drainage channel GLUING INSTRUCTIONS ΈCONT Ή DO NOT GLUE IN BETWEEN THE TRAYS ONLY GLUE ON TOP OF SEAM W...

Page 18: ...E INNOVATIVE GROWERS EQUIPMENT YouTube PAGE FOR STEP BY STEP VIDEO INSTRUCTIONS If you would like to use the included bulkhead fiƫng for draining and filling Simply uses a 1 3 8 hole saw to drill a hole in the sump and aƩach fiƫng Drill the hole through the plasƟc table not the Bench filter ΈA12Ή SCREEN FOR BULKHEAD FITTING hƩps www youtube com channel UCXjy4c2QDWEOUFKgJZsDZxQ ΈA13Ή 3 4 BULKHEAD F...

Reviews: