Insulation Work 

Installation 

29 

For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal with, at the same time, at two ends 
of the pipe, remain some length not to be insulated, in order to be welded and check the leakage after laying the pipes. 

3).  Insulate for the jointing area, expanding area and the flange area 

 Insulate for the jointing area, expanding area and the flange area should be done after checking leakage of the pipe

 Make sure there’s no clearance in the joining part of the accessorial insulation material and local preparative insulation material. 

5.3 Drainage pipe insulation 

1)

The connection part should be insulated, or else water will be condensing at the non-insulation part.

5.4 Note

1)

The jointing area, expanding area and the flange area should be heat insulated after passing the pressure test

2)

The gas and liquid pipe should be heat insulated individually, the connecting part should be heat insulated individually.

3)

Use the attached heat-insulation material to insulate the pipe connections (pipes’ tie-in ,expand nut ) of the indoor unit.

6. Wiring

Please refer to the Wiring Diagram.

Summary of Contents for TC18C2DWB1

Page 1: ...FAN COIL INSTALLATION MANUAL TC18C2DWB1 TC24C2DWB1 TC37C2DWB1 TC48C2DWB1 TC60C2DWB1 2015 Innovair Corporation All Rights Reserved www innovair com ...

Page 2: ...tion 20 Installation Installation 1 Precaution on Installation 21 2 Vacuum Dry and Leakage Checking 22 3 Additional Refrigerant Charge 24 4 Water Drainage 25 5 Insulation Work 28 6 Wiring 29 7 Test Operation 30 ...

Page 3: ... absolutely as original state Every time you connect it first loosen the nuts at the part of stop value then connect the flare pipe immediately in 5 minutes If the nuts have been loosened for a long time dusts and other impurities may enter the pipe system and may cause malfunction later So please expel the air out of the pipe with refrigerant before connection c Expel the air after connecting the...

Page 4: ...o different construction environment common vacuum dry special vacuum dry Common vacuum dry procedure Vacuum dry for the first time connect the all purpose detector to the inlet of liquid pipe and gas pipe and run the vacuum pump more than two hours the vacuum pump should be below 755mmHg If the pump can t achieve below 755mmHg after pumping 2 hours moisture or leakage point will still exist in th...

Page 5: ...e second time Fill nitrogen to 0 5Kgf cm2 Because nitrogen is for drying gas it has vacuum drying effect during vacuum destroy But if the moisture is too much this method can t dry thoroughly So please pay more attention to prevent water entering and forming condensation water Vacuum dry for the second time 1h pumping Determinant Pass if achieving below 755mmHg If 755mmHg can t be achieved in 2h r...

Page 6: ...s charged e Refrigerant containers shall be opened slowly f Always use protective gloves and protect your eyes when charging refrigerant The outdoor unit is factory charged with refrigerant Calculate the added refrigerant according to the diameter and the length of the liquid side pipe of the outdoor unit indoor unit For 12kBtu h outdoor unit throttle R g D mm L m 6 4 Less than 5m One way Added Re...

Page 7: ...to prevent atomization Drainpipe should be installed before installing indoor unit After powering on there is some water in water receiver plate Please check if the drain pump can operate correctly All connection should be firm Wipe color on PVC pipe to note connection Climbing horizontal and bending conditions are prohibited The dimension of drainpipe can t less than the connecting dimension of i...

Page 8: ...I D mm Thick Hard PVC 14 25 3 0 Hard PVC 14 88 30 3 5 Hard PVC 88 334 40 4 0 Hard PVC 175 334 50 4 5 Hard PVC 334 80 6 0 4 5 Drainage test 1 Drainage without drain pump After finishing drainpipe installation pour some water into the water receiver plate to check if the water flows smoothly 2 Drainage with drain pump Poke the Water Level Switch remove the cover use water pipe to pour 2000ml water i...

Page 9: ...lamp flashes even overflow from the water receipt plate Keep on pouring water until it gives an alarm signal for high water level check if the pump drains water at once If the water level can t fall below the alarmed water level after 3 minutes the air conditioner will stop Turn off the power and drain the remained water and then turn on the air conditioner Note the drain stuff in the main water r...

Page 10: ... above 100 2 Thickness choice for insulation material Insulation material thickness is as follows Pipe diameter mm Adiabatic material thickness 6 4 25 4 10mm Refrigerant pipe 28 6 38 1 15mm Drainage pipe Inner diameter 20 32 6mm 5 2 Refrigerant pipe insulation 1 Work Procedure Before laying the pipes the non jointing parts and non connection parts should be heat insulated When the gas proof test i...

Page 11: ...e s Make sure there s no clearance in the joining part of the accessorial insulation material and local preparative insulation material 5 3 Drainage pipe insulation 1 The connection part should be insulated or else water will be condensing at the non insulation part 5 4 Note 1 The jointing area expanding area and the flange area should be heat insulated after passing the pressure test 2 The gas an...

Page 12: ...ditioner is pre heated by turning on the power 3 According to the user s requirement install the remote controller when the remote controller s signal can reach the indoor unit smoothly 4 Test operation Set the air conditioner under the mode of COOLING with the remote controller and check the following points Indoor unit Whether the switch on the remote controller works well Whether the buttons on...

Reviews: