23
EN
SANDWICH-13 / 180626 / www.innotech.at
15
ACCEPTANCE LOG
FASTENER/PHOTO DOCUMENTATION
PRODUCT:
Item ____________
Year of construction/Serial number:
(Type designation EAP / anchorage point)
Installation substructure:
(e.g.: solid concrete quality: C20/25, wood rafter dimension, for sheet metal roofs: roof manufacturer, profile, material, sheet metal
thickness, etc.)
Date:
Location:
Dowel type:
BEF/Sticker?/
Designation
Setting
depth:
[mm]
Drill bit
Ø:
[mm]
Torque:
Photos:
(storage
location)
mm
mm
Nm
mm
mm
Nm
The installation company who signs warrants correct workmanship (edge spacing, inspection of the substructure, proper cleaning
of bores, compliance with curing times and processing temperature, compliance with the dowel manufacturer's guidelines, etc.)
The client accepts the work performed by the contractor. The user instructions, documentation of the fastenings, and photo
documentation and test logs have been transferred to the client (building owner) and have been made available to the user.
When accessing the restraint system, the building owner must document the positions of the attachment devices by means
of diagrams (e.g. top view of the roof).
The expert fitter familiar with the restraint system confirms that the installation work has been executed properly,
as per the state of the art, and in accordance with the manufacturer's instruction manual. The technical safety
reliability is confirmed by the installation company.
Handover of:
(e.g: personal protective equipment PPE, fall arrest devices HSG, storage cabinet, etc.)
Item
Item
Item
Item
Included in lightning protection system?
YES NO
Comments:
Name:
ACCEPTANCE LOG NO.
____
(PART 2/2)
S
A
N
D
W
I
C
H
-
1
3
Client
Date, company stamp, signature
Date, company stamp, signature
Inspection: Contractor (expert who is familiar
with the safety system)