Page 7 of 10
Edition 06/23/2014
INNOTECH
EAP QUAD-13
INNO
TECH
SAFETY SOLUTIONS
Arbeitsschutz GmbH
A C C E P T A N C E L O G
PROJECT:
PRODUCT:
units
MANUFACTURING NO.:
CLIENT:
CONTRACTOR:
INSTALLATION
COMPANY:
SPECIALIST:
COMPANY
ADDRESS:
•
Client accepts the performances of the contractor.
•
The instructions for installation and use, dowel log and photo documentation have been
transferred to the client (building owner) and have been made available to the user. When
accessing the roof securing system, you must document the positions of the attachment
devices by means of diagrams (e.g. top view of the roof).
•
The expert fitter familiar with the safety system confirms that the installation work
has been executed properly, in accordance with the state of the art, and in
accordance with the manufacturer's instructions for installation and use. The safety
specifications for reliability are confirmed by the installation company.
Comments:
D O W E L L O G / P H O T O
D O C U M E N T A T I O N
Date:
Location:
Dowel type:
Setting
depth:
Drill bit Ø:
Tightening
torque:
Photos:
(File name)
The undersigned installation company warrants that the dowels have been properly processed in accordance with the dowel manufacturer's
guidelines. (Proper cleaning of bores, compliance with curing times and processing temperature, edge spacing of the dowels, inspection of
the substrate, etc.)
Substrate (concrete quality C16/20), rafter dimension, etc.):
Installation of the support structure by:
Installation of cable system by:
Client:
Fitter:
NAME
NAME
DATE, SIGNATURE
DATE, SIGNATURE