8
AIO-ENDS-10 / Version 170524 / www.innotech.at
EN
7
INSTALLATION
4.
Fix the cable loop and clamping mandrel with a few
hammer taps (plastic mallet).
≤
45 mm
Assemble the other components.
5.
60
≥
mm
≥
60
mm
The end of the "AIO-SEIL-30" must project by at least 60 mm.