11
EN
AIO-ENDS-10 / Version 170524 / www.innotech.at
7
INSTALLATION
For longer lifeline systems, tension the partial span
segments, and maintain the tension using an indicator
clamp or tensioning devices.
3.
4.
INNO
TECH
≥
330
mm
~ 230 mm
Do NOT tension the complete cable span all at once.
Remove the indicator clamps after tensioning.
Thread the
2nd
end lock tube onto the "AIO-SEIL-30". Kink
the "AIO-SEIL-30" ~ 230 mm before the end-lock fastening.
Guide the clamping mandrel as far as the kink point.
Fit the end lock tube after points 3 - 7 (section 7.1).