29
signal strength while monitoring the LED indications.
Fig. 26 Verifying Reception Status Diagram
4) Once the positioning and direction of the Donor Unit has been finalized, use the DIP Switch
to activate the UL path.
1 2
3
4
5
6
7
8
9 10 11
1 2
3
4
5
6
7
8
9 10 11
Fig. 27 DIP Switch (Uplink Path Activation)
Summary of Contents for Juni JR20 MPE25K
Page 1: ...VzW MPE25K Installation Manual 2008 04 Draft Ver 0 5...
Page 36: ...36 Appendix C System Block...
Page 38: ...38...