
27
2). Once power connection has been successfully made (this can be verified by checking the
Alarm LED on the Donor Unit and LED indications on the Coverage Unit, the Donor Unit azimuth
should be positioned so that maximum signal level is being received from the BTS. This can be
monitored via the LEDs which indicate the signal strength reading (RSSI).
(The recommended LED RSSI reading is 3 bars)
Summary of Contents for Juni JR20 MPE25K
Page 1: ...VzW MPE25K Installation Manual 2008 04 Draft Ver 0 5...
Page 36: ...36 Appendix C System Block...
Page 38: ...38...