An m8 flange nut is used to fasten the power box bracket
to the vibra-mount stud.
Insert the three inch end of the intake into the throttle body hose (A). Once the
3” side has been positioned, continue to insert the 4” end into the power box
straight hose(B).
The intake is now aligned for the best possible fit. Once the intake has been
cleared from any possibility of rubbing, continue to tighten all nuts, bolts and
clamps.
Once the bracket and power box have been assem-
bled, the leg on the bracket will be located on the
radiuses side of the power box.
Press the 4” straight hose over the velocity stack
end. Use the two large power bands over the hose
and tighten the band located over the velocity stack
end.
Loosen and remove the two m6 x 65mm bolts that
secures the velocity stack base to the body.
The second 65mm bolt is inserted into base and
body.
Page 3 of Part# PF2057
Align the power box bracket to the holes located on
the base, Use the same m6 x 65mm bolts to fasten
the bracket to the base.
Press the 18” -4mm vacuum line over the 3/16”
intake port as shown above.
Once the Power box is aligned to the intake end,
continue to tighten the flange nut to the vibra-
mount stud.
Lower the assembled power box into the engine
compartment. Insert the upper vibra-mount stud into
the hole located on the bracket.
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
>>>>
(A)
(B)
>>>>