
INHECO
07
Doc ID: 900113-003
July 2020
2.2.
Scope of Supply
Before initial operation, make sure that the shipment of your unit and its scope of supply
is complete and no parts are damaged.
In case of parcel or product damages, make photos of the damaged boxes and products
and email them to
immediately. Transportation damages
must be reported to INHECO within 7 days of delivery. The following components should
be included in each shipment:
Fig.1: Scope of Supply
( 1 ) Thermoshake incl. Sub-D-Connector Cable *
( 2 ) Syringe to refill the cooling liquid
( 3 ) Syringe needle to refill the cooling fluid
( 4 ) Cooling fluid
( 5 ) Socket wrench for filling nozzle of the cooling liquid reservoir
( 6 ) 3 allen screws to fix thermal adapters
* image may vary depending on what Thermoshake is ordered.
The Sub-D-Connector Cable is already connected with the Thermoshake and it also
needs to be conntected to the Black Slot Module installed inside the TEC Control Unit
(MTC or STC). → Initial Operation, page 12.
6
1
2
5
3
4
Cable with Sub-D-Connector