AAY2000IKE03
20
User manual
D
E
EN
ES
FR
IT
3.3. Main menu
The main menu is structured into the following sub-menus:
10:22
14/04/11
MAIN MENU
Monitoring
Configuration
Language
Change date
10:22
14/04/11
MAIN MENU
Change date
Start/Stop
Partial Data Reset
Change inv number
Monitoring
Displaying the values for the principal parameters and internal variables, providing details as to
the equipment operating status.
Configuration
This menu offers the possibility of changing various firmware parameters in order to adapt the
inverter to different operating conditions.
Language
This menu allows the user to select an available language.
Change date
To change the inverter date and time.
Start/Stop
This menu serves to manually run or stop the inverter operation.
Partial Data Reset
To zero the data stored in
Part E
,
Tp con
and
Npcon
.
Change inv number
This menu makes it possible to assign an identification number to the inverter within the PV
array.
3.4. Monitoring
Once monitoring menu
Monitoring
has been selected, click on
OK
to access the same. The first screen displays a
menu which allows you to select each of the three inverter output phases, as the data for each phase are displayed
separately. For example, to view Phase 1, this should be selected using keys
and
then click on
OK
.
10:22
14/04/11
MAIN MENU
Monitoring
Configuration
Language
Change date
10:22
14/04/11
MONITORING
Phase 1
Phase 2
Phase 3
This leads to a series of six screen which display the principal
variables monitored. The screen on the right shows the first
variable.
To scroll from one screen to another, use keys
and
.
10:22
14/04/11
MONITORING Phase 1
Pout
5000 W
Vac
239 V
Iac
21.83 A
Fac
49.89 Hz
PhiCos
0.998
Listed below is a description of the variables in each particular screen.
Screen 1
Pout
Power (W) delivered by the inverter to the Electric Grid.
Vac
Output voltage (V) of the inverter at the Electric Grid connection.
Iac
Inverter output current (A).
Fac
Current output frequency to the Electric Grid (Hz).