12. Verify all fasteners are tight and secure. Install lifting device
on Jib Crane trolley.
13. Turn on power to lifting device and test operation.
900J Jib Crane
Refer to Dwg. MHP1995 on page 28.
1.
Install air supply line in column if required and connect to
pivot assembly (52).
2.
Install pivot assembly (52) on column (12). Secure in
position with capscrews (9), lockwashers (7) and nuts (8).
3.
Install boom mount (13). Secure boom mount (13) to pivot
assembly (52) with capscrews (9), nuts (8) and washers (7).
Check boom mount rotates freely.
4.
Ensure redundant end stop (34) is installed in boom at boom
mount end with bolts (36) and nuts (35).
5.
Support the weight of the boom (41) and keeping boom
parallel to the floor slide boom onto boom mount (13).
Secure in position with capscrews (36) and nuts (35).
6.
Install trolley.
7.
Install redundant end stop (34) and end cap (30) in boom (41)
tip. Secure with capscrews (31) and (36) and nuts (32).
8.
Verify all fasteners are tight and secure. Install lifting device
on Jib Crane trolley.
9.
Turn on power to lifting device and test operation.
Pivot Assembly and Installation
Refer to Dwg. MHP1566 on page 30.
1.
Clean bearings (62) with mineral spirit solution to remove all
grease. Dry bearings.
2.
Re-pack bearings with grease (Zimmerman P/N 10885 –
refer to “LUBRICATION” Section on page 16).
3.
Install bearings to bearing hub (64) and bearing post (61).
4.
Install bearing hub (64) on bearing post (61).
5.
Install lockwasher (65) on bearing post (61).
• The following torque procedure must be followed to ensure
that spanner nut torque is correct, bearings have been seated,
and nut will not lose torque. Failure to follow these
instructions will decrease performance of the pivot and may
cause damage to the jib boom.
6.
Tighten spanner nut (66) to 200 ft.-lbs. (271 Nm)
7.
Rotate pivot assembly left and right to seat bearings.
8.
Torque spanner nut to 200 ft.-lbs. (271 Nm)
9.
Rotate pivot assembly left and right to seat bearings.
10. Torque spanner nut to 200 ft.-lbs. (271 Nm)
11. Rotate nut clockwise until a lockwasher tang is aligned with a
slot on spanner nut. Bend tang into slot.
12. Install pivot assembly on column.
13. Torque pivot mounting bolts to 50 ft.-lbs. (68 Nm)
• Ensure the tang on the lockwasher in the upper housing
engages a slot on the pivot pin.
• Tighten pivot spanner nut securely, but not so much that the
lower housing assembly will not swivel.
Air System Installation
Refer to Dwg. MHP2051 on page 32.
1.
Assemble swivel compression fittings (148) to pre-coiled
tubing (149).
2.
Install hose fittings (151) to each end of the rubber hose
(152).
3.
Install adapter-fitting (153) to one end of the rubber hose
(152).
4.
Connect adapter (150) to one end of the pre-coiled tube
(149).
5.
Align bracket (83) with each end of the jib boom.
6.
Determine which side of the bracket to install the
filter/regulator (55). The regulator should be installed at the
pivot end of the boom, to the column or wall side of the
bracket.
7.
Install filter/regulator (55) to bracket (83).
8.
Install elbow fitting (147) to bracket (83).
9.
Install eye bolt and nut assemblies (94) to brackets (83). The
eye portion of the bolts will face each other when the
brackets are installed.
10. Install thimble (93) to eyebolt (94).
11. Thread cable (91) through the center of the pre-coiled tube
(149).
12. Thread cable (91) through the eyebolt (94) and thimble (93).
13. Install clamps (92) to cable (91). Do not tighten, rather snug
the bolts so cable will not slip through clamp.
14. Install brackets (83) to top of jib boom with the eyebolts
toward each other, using bolts (80), washers (82),
lockwashers (81) and plates (84).
15. Tighten clamps (92) at one end of cable.
16. At opposite end of cable thread excess cable through clamps
increasing tension until cable supports the weight of the pre-
coiled tube.
17. Tighten clamp (92).
18. Connect adapter-fitting (152) to lifting unit inlet.
19. Rotate shut off valve to the closed position.
20. Connect plant air supply or column air supply to regulator
(55) inlet.
21. Rotate shut valve to the open position.
22. Adjust regulator to 100 psi (6.9 bar).
Electrification System Installation
Refer to Dwg. MHP2050 on page 34.
1.
Align bracket (83) with each end of the jib boom.
2.
Determine which side of the bracket to install the anchor
bracket (96). The anchor bracket must be installed closest to
the pivot or wall end.
3.
Install eye bolt and nut assemblies (94) to brackets (83). The
eye portion of the bolts will face each other when the
brackets are installed.
4.
Install thimble (93) to eyebolt (94).
5.
Thread cable trolleys (90) and towing trolley (86) onto cable
(91). Ensure towing trolley is nearest the handling device.
Wheels of towing trolley sit below cable.
6.
Tread cable (91) through the eyebolt (94) and thimble (93).
7.
Install clamps (92) to cable (91). Do not tighten, rather snug
the bolts so cable will not slip through clamp.
8.
Install brackets (83) to top of boom with the eyebolts toward
each other, using bolts (80), washers (82), lockwashers (81)
and plates (84).