12
MHD56209 - Edition 2
5.
Has the Jib Crane’s anchorage been designed by a registered
structural engineer to suit the installation?
6.
Will the Jib Crane conflict with utility supply lines, overhead
electrical conduit or any utility that could represent a
potential danger?
7.
Does the proposed location allow enough space for
maximum load travel in the direction you propose?
8.
Is the proposed location in an area easily kept clean and free
of obstruction?
9.
Does the proposed location and installation meet all
applicable code requirements?
If you answered no to any of these questions, please copy and
fax this checklist to Ingersoll-Rand at 248-293-5800 for a free
initial consultation.
•
• Check the installation area for conflicts with utility supply
lines, overhead electrical conduits or any utility that could
present potential danger to the system or personnel.
• System installation, maintenance and disassembly
procedures require at least two people. Parts are too large and
heavy for one person to safely handle.
The following should be adhered to during installation:
1.
All bolted constructions must be completely tightened and
torqued to specifications as shown in the Torque
Specification Table on page 9.
• Before starting installation, clear workspace or set-up area of
debris or obstructions. Always keep system workspace clear of
obstruction, debris, spills and standing water.
Air System
Most handling devices will require an air supply which is clean
and free from water, water vapor and oil. 6.9 bar/690 kPa (100 psi)
at the handling device is normally required to provide rated
capacity. Do not exceed 6.9 bar/690kPa (100 psi).
• Do not use an air line lubricator of any kind. Oil may damage
internal components.
Check handling device manufacturer’s specifications for correct
air supply requirements.
1.
Install handling device on Jib Crane.
2.
Install air system as described in “MAINTENANCE” section
on page 17.
3.
Connect air supply to handling device.
4.
Turn on air supply and check system for leaks.
5.
Operate handling device.
Refer to “AIR SUPPLY ASSEMBLY” on page 33 in parts section
for air supply kits.
Electrification System
1.
Install handling device on Jib Crane.
2.
Install electrification system as described in
“MAINTENANCE” section on page 17.
3.
Connect electrical power supply to handling device.
4.
Turn on power.
5.
Operate handling device.
Refer to “ELECTRIFICATION ASSEMBLY” on page 35 in parts
section for electrification kits.
Installation Test
Step 1
Verify that jib crane boom, hoist, positioner or handling device
move freely throughout entire intended work space without
binding.
Step 2
Lift a test load
while standing clear of the system
. This load
should be 1/4 the maximum load. Notice any problems that may
occur while lifting this load. Repeat step 1 with this load. At each
testing step, correct any problems that may occur while testing
system, and retest if necessary before continuing to the next step.
Step 3
Repeat steps 1 and 2, lifting the maximum rated load. Correct any
problems that may occur while lifting this load, and retest if
necessary before putting system into service. If you encounter a
problem you do not know how to correct, call your nearest
Ingersoll-Rand
office or distributor.