General Description
25
Unit Operation
Standard Model 10 and 20 units (without heat
options) operate in Cool mode or Null mode, as
required, to maintain the load compartment
temperature at the setpoint temperature.
Model 30 and 50 units and 10 and 20 units with
heat options operate in Cool, Null or Heat, as
required, to maintain the load compartment
temperature at the setpoint temperature.
Defrost cycles occur manually or automatically,
as required.
If power is shut off, the unit comes back in Null
mode when the unit is restarted. There is a
momentary delay at auto start-up for circuit
protection.
NOTE: The compressor will “bump start” five
times while coming out of Null when the unit is
restarted after being turned off. This does not
happen if the unit went into Null because it
reached setpoint. In a “bump start” the
compressor is turned on for about one second
and then goes off for about four seconds.
Figure 5: Thermostat Algorithm
For units with Electric Standby, there are
protective delays for the electric
compressor/compressor motor contactor.
Options
•
The Heat options provide heating by hot water
or hot gas. Some Model 20 units also have
electric heaters.
•
The Electric Standby options provide a second
electric compressor for standby applications.
•
The TC options provide temperature control
for two-compartment systems.
Operation
The vehicle engine must be running and the unit
must be turned on. On units with Electric Standby,
connect the external power cord and the unit
switches to Electric mode operation. Unit
operation can be tailored, as required, using
programmable settings that are shown later is this
section.
Cool Mode
Standard Model 10 and 20 Units
When cooling is required (when there is a
requirement to lower the evaporator return air
temperature in the load compartment), the
controller energizes the compressor clutch (or
compressor contactor in model 20 units) and
evaporator fans. The controller monitors the
discharge pressure through the high pressure
transducer (THPCO). The condenser fans are
energized if necessary and turn on and off as
determined by the controller.
The unit operates in Cool mode until the setpoint
temperature is reached. The unit then enters Null
mode. When the temperature rises to a
pre-determined number of degrees, the unit
restarts in Cool mode.
V-520 units only have a triple-cooling capacity
(TCC) feature. The controller monitors the
discharge pressure through the high pressure
transducer (THPCO) and controls the speed of
condenser fans CF1 and CF2 by opening and
closing relays RY6, RY9, RY10 in the following
manner:
•
When the discharge pressure is less than 180
psig (1241 kPa), RY6, RY9, and RY10 are
open. CF1 and CF2 receive no voltage and are
in Null state.
•
When the discharge pressure is between 180
psig (1241 kPa) and 300 psig (2068 kPa), RY9
closes. CF1 and CF2 become connected in
series, receive low voltage, and operate at low
speed
Decrease in
Temperature
Temperature Setpoint
Increase in
temperature
X C/F above the setpoint
X C/F below the setpoint
COOL
HEAT
NULL
MODE
Summary of Contents for 900829
Page 2: ......
Page 91: ...89 V 520 10 30 V 520 MAX 10 30 Wiring Diagram page 1 of 2 Thermo King RELEASED 26 Mar 2014...
Page 92: ...90 V 520 10 30 V 520 MAX 10 30 Wiring Diagram page 2 of 2 RELEASED 26 Mar 2014...
Page 93: ...91 V 520 10 30 V 520 MAX 10 30 Schematic Diagram page 1 of 2 Thermo King RELEASED 26 Mar 2014...
Page 94: ...92 V 520 10 30 V 520 MAX 10 30 Schematic Diagram page 2 of 2 Thermo King RELEASED 26 Mar 2014...
Page 96: ...94 V 520 20 50 1PH V 520 MAX 20 50 1PH Wiring Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 98: ...96 V 520 20 50 1PH V 520 MAX 20 50 1PH Schematic Diagram page 1 of 3 RELEASED 26 Mar 2014...
Page 99: ...97 V 520 20 50 1PH V 520 MAX 20 50 1PH Schematic Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 100: ...98 V 520 20 50 1PH V 520 MAX 20 50 1PH Schematic Diagram page 3 of 3 RELEASED 26 Mar 2014...
Page 102: ...100 V 520 20 50 3PH V 520 MAX 20 50 3PH Wiring Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 104: ...102 V 520 20 50 3PH V 520 MAX 20 50 3PH Schematic Diagram page 1 of 3 RELEASED 26 Mar 2014...
Page 105: ...103 V 520 20 50 3PH V 520 MAX 20 50 3PH Schematic Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 106: ...104 V 520 20 50 3PH V 520 MAX 20 50 3PH Schematic Diagram page 3 of 3 RELEASED 26 Mar 2014...
Page 107: ...105 V 520 MAX 10 SPECTRUM Wiring Diagram...
Page 108: ...106 V 520 MAX 10 SPECTRUM Schematic Diagram page 1 of 2 2A 2A...
Page 109: ...107 V 520 MAX 10 SPECTRUM Schematic Diagram page 2 of 2 2A 2A...
Page 110: ...108 V 520 MAX 20 SPECTRUM 1PH Wiring Diagram page 1 of 3...
Page 111: ...109 V 520 MAX 20 SPECTRUM 1PH Wiring Diagram page 2 of 3...
Page 112: ...110 V 520 MAX 20 SPECTRUM 1PH Wiring Diagram page 3 of 3...
Page 113: ...111 V 520 MAX 20 SPECTRUM 1PH Schematic Diagram page 1 of 3...
Page 114: ...112 V 520 MAX 20 SPECTRUM 1PH Schematic Diagram page 2 of 3...
Page 115: ...113 V 520 MAX 20 SPECTRUM 1PH Schematic Diagram page 3 of 3...
Page 116: ...114 V 520 MAX 20 SPECTRUM 3PH Wiring Diagram page 1 of 3...
Page 117: ...115 V 520 MAX 20 SPECTRUM 3PH Wiring Diagram page 2 of 3...
Page 118: ...116 V 520 MAX 20 SPECTRUM 3PH Wiring Diagram page 3 of 3...
Page 119: ...117 V 520 MAX 20 SPECTRUM 3PH Schematic Diagram page 1 of 3...
Page 120: ...118 V 520 MAX 20 SPECTRUM 3PH Schematic Diagram page 2 of 3...
Page 121: ...119 V 520 MAX 20 SPECTRUM 3PH Schematic Diagram page 3 of 3...
Page 122: ...120 V 520 MAX 20 SPECTRUM 3PH 50 60 Hz Wiring Diagram page 1 of 2...
Page 123: ...121 V 520 MAX 20 SPECTRUM 3PH 50 60 Hz Wiring Diagram page 2 of 2...
Page 124: ...122 V 520 MAX 50 SPECTRUM 1PH Wiring Diagram page 1 of 2 Thermo King RELEASED 26 Mar 2014...
Page 125: ...123 V 520 MAX 50 SPECTRUM 1PH Wiring Diagram page 2 of 2 Thermo King RELEASED 26 Mar 2014...
Page 126: ...124 V 520 MAX 50 SPECTRUM 1PH Schematic Diagram page 1 of 3 RELEASED 26 Mar 2014...
Page 127: ...125 V 520 MAX 50 SPECTRUM 1PH Schematic Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 128: ...126 V 520 MAX 50 SPECTRUM 1PH Schematic Diagram page 3 of 3 RELEASED 26 Mar 2014...
Page 129: ...127 V 520 MAX 50 SPECTRUM 3PH Wiring Diagram page 1 of 2 Thermo King RELEASED 26 Mar 2014...
Page 130: ...128 V 520 MAX 50 SPECTRUM 3PH Wiring Diagram page 2 of 2 Thermo King RELEASED 26 Mar 2014...
Page 131: ...129 V 520 MAX 50 SPECTRUM 3PH Schematic Diagram page 1 of 3 RELEASED 26 Mar 2014...
Page 132: ...130 V 520 MAX 50 SPECTRUM 3PH Schematic Diagram page 2 of 3 RELEASED 26 Mar 2014...
Page 133: ...131 V 520 MAX 50 SPECTRUM 3PH Schematic Diagram page 3 of 3 RELEASED 26 Mar 2014...
Page 134: ...132 V 520 10 Refrigeration Diagram...
Page 135: ...133 V 520 20 Refrigeration Diagram...
Page 136: ...134 V 520 30 Refrigeration Diagram...
Page 137: ...135 V 520 50 Refrigeration Diagram...
Page 138: ...136 V 520 10 SPECTRUM Refrigeration Diagram...
Page 139: ...137 V 520 20 SPECTRUM Refrigeration Diagram...
Page 140: ...138 V 520 50 SPECTRUM Refrigeration Diagram Thermo King RELEASED 19 Jul 2012...
Page 141: ......