Page 1: ...1 96194 05 2021 Gb Bock HG34P e Maintenance manual 96193 05 2021 D colour the world of tomorrow BOCK ...

Page 2: ...hese instructions Liability and warranty Manufacturer s liability and warranty are excluded if Alterations and functional modifications have been carried out No original replacement parts have been used Contents Page 1 Safety 3 2 Fault diagnosis 4 3 Disassembly of the compressor 8 4 Checking the compressor parts 19 5 Assembly of compressor 21 6 Exploded drawing 33 Contact Bock GmbH Benzstraße 7 72...

Page 3: ...ertinent regulations and documentation means that they are capa ble of assessing the work to be carried out and detecting any possible dangers Specialist can mean a refrigeration technician for example Note that electrical work may only be carried out by a qualified electrician Alternatively on a country specific basis persons who have undergone elec trotechnical instruction and who have proof of ...

Page 4: ...noise Compressor stand still Compressor does not start Problem Possible cause Remedy Control circuit is interrupted Main or control fuse is switched off or tripped Setting selection incorrect Motor overloaded Undervoltage Starter contacts shorted contacts earthed contacts Replace fuse Determine and remove the cause Cut off through Low pressure switch High pressure switch Heat protection thermostat...

Page 5: ...ct refrigerant to normal filling Non condensible gases in refrigerant Extract refrigerant and evacuate the refrigeration plant refill refrigerant Cutoff through heatprotection thermostat accessory Discharge end temperatures is too high Operating limits of compressor exceeded Adapt the operating conditions to the operating range Suction gas overheating Check expansion valve check insulation on the ...

Page 6: ... valve if necessary Lack of compressor capacity Check the function of the compressor by evacuating to vacuum Check function of capacity regulator accessory Shortage of refrigerant Run leakage test refill refrigerant Suction pressure too low See Cutoff through low pressure switch Checking High pressure too high See Cutoff through high pressure switch Checking High pressure too low Condenser being c...

Page 7: ...on discharge laminations of the valve plate leaking Replace valve plate 2 I Fault diagnosis Abnormal running noise from compressor Problem Possible cause Remedy Fixation of compressor is loose Screwed connections have become loose Securing elements for screwed connections missing Tighten the screwed connections and secure them anew Vibration metals defective Replace vibrations metals Liquid shock ...

Page 8: ...stalled by the user have been mounted expertly and are connected pressure tight to the compressor Open the pressure and suction shut off valves Set off the switching on lock INFO Use only new gaskets for assembly For 2 pole compressors the stator is built at factory in while it is still warm A removal is therefore not possible For 4 pole compressors the stator screw Pos 1020 in the parts list has ...

Page 9: ...g at the system Close shut off valves on the suction and discharge side Extract the refrigerant from the compressor into a container which may be used for this refrigerant Evacuate the compressor Cut off the vacuum Remove the compressor from the system Close the suction and discharge shut off ports on the compressor with stoppers Disassembly of compressor The disassembly of the compressor is expla...

Page 10: ... Nr 0 2 30 120 0 3 6 30 1000 0 8 Benennung 400 Änderungsbeschreibung Blatt Oberflächenb 1 Zone Gepr Änderungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder ...

Page 11: ...vielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte ist nicht gestattet Wir behalten uns alle Rechte gemäß DIN ISO 16016 an dieser Zeichnung vor Unbemaßte Radien Benzstraße 7 72636 Frickenhausen bis 6 über 0 5 0 5 400 120 Passung Maß Ra Rz Tol Ang DIN ISO 2768 ...

Page 12: ...etzt durch Ersatz für DIN ISO 13715 Werkstückkanten Rz 1 6 0 05 30 03 Datum Name Gepr Ausgangsteil bzw Rohteil Werkstoff Änderungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände dur...

Page 13: ... 5 Der Lieferant muß sicherstellen dass die Ware in einwandfreiem Zustand angeliefert wird Korrosions schutz Verpackung für sicheren Transport F user kurz 3D Sachen 3D Teile HG34P für Wartungshandbuch Rotor ausbauen Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link http www youtube com watch v JNS9 4mNX7c F E D C 4 3 2 A B 5 6 7 8 2 3 4 5 6 7 8 Kurbelwe...

Page 14: ...sbauen 4 3 2 1 5 6 7 1 2 3 4 5 6 7 Stator ausbauen WHB HG34 1 3 Maßstab 0 1 Gewicht kg Gußtoleranzen x xxxx xxxxx x Oberflächenangaben ISO 1302 Zeichn Nr Teile Nr 0 2 30 120 0 3 6 30 1000 0 8 Benennung 400 nderungsbeschreibung Blatt Oberflächenbehandlung Härte 1 x Zone Geprüft 2011 Erstellt Ersetzt durch Ersatz für DIN ISO 13715 Werkstückkanten 30 0 Datu Gepr Ausgangsteil bzw Roht Werkstoff Änderu...

Page 15: ... Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link http www youtube com watch v JNS9 4mNX7c F E D C B 1 2 3 4 F E D C B Tol Ang DIN ISO 2768 mK Alternativbezug Baumustergeprüft Lieferantenzeichnung PL Entwicklungsstand 120 400 0 5 über 0 5 bis 6 Bearb Datum Änderungs Nr Werkstoff Ausgangsteil bzw Rohteil Gepr Zone 1 x Blatt Änderungsbeschreibung 400 Ben...

Page 16: ...onnect in terminal box Losen screws at the cylinder cover and unscrew Remove cylinder cover with seals and valve plate 3 4 5 6 7 Tol Ang DIN ISO 2768 mK Ra 120 400 0 5 über 0 5 bis 6 Unbemaßte Radien Diese Zei Änderungsbeschreibung 400 Benenn 0 8 1000 30 6 0 3 120 30 0 2 Zeichn Oberflä x x Zust Gußtoleranzen Gewicht kg 0 1 R s 25 Der Lieferan einwandfreie schutz Verp Möchten Sie diesen Montageschr...

Page 17: ...enbehandlung Härte 1 x Zone G E E E DIN ISO 13715 Werkstückkanten Gepr Ausgangst Werkstoff Änderungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte is...

Page 18: ...r Änderungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte ist nicht gestattet Wir behalten uns alle Rechte gemäß DIN ISO 16016 an dieser Zeichnung vo...

Page 19: ...n unhindered oil flow is ensured Clean the oil channels with compressed air and check for passage Piston cylinder bore 0 13 mm Connecting rod piston pin 0 03 mm Crankshaft connecting rod 0 08 mm 1 2 3 1 2 3 Checking compressor parts for damages and wear Before re using removed compressor parts we recommend that they be checked for usability The wear limits listed below should be taken into conside...

Page 20: ...The connecting rod shank must be straight Valve plates Suction and pressure lamella must be undamaged and un deformed The sealing surfaces must be clean and undamaged between lamellas and valve plates there should not be any pollution dirt swarfs etc In case of a damage the valve plate must be replaced completely Single lamella are not available Oil pump It must be possible to turn the oil pump by...

Page 21: ...eals Thus concealed defects of parts which have been in operation may be prevented 5 I Assembly of compressor Assembly of compressor The assembly of the compressor is explained in separate steps on the following pages The indicated parts list positions refer to the spare parts lists repair set lists special accessories part lists and is available online at vap bock de Follow the stated tightening ...

Page 22: ...orking course 2100 270 280 Assemble piston and connecting rod with piston pin use some oil for easier assembly Mount circlips with pliers on both sides of the piston pins 5 I Assembly of compressor Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link http www youtube com watch v JNS9 4mNX7c ...

Page 23: ...ourse 290 300 We recommend cleaning the housing from the inside before assembly Apply a little oil to the cylinder bore Insert pistons connecting rods from below into the cylinder liners Pay attention to the correct assembly position suction fin grooves Install oil scraper rings in the lower groove and pressure rings in the upper groove Fit with the marking TOP facing upwards The butt joints of th...

Page 24: ...arb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte ist nicht gestattet Wir behalten uns alle Rechte gemäß DIN ISO 16016 an dieser Zeichnung vor Unbemaßte Radien Benz...

Page 25: ...s seals above and cylinder cover together Tighten the screws crosswise 3 4 5 6 7 Tol Ang DIN ISO 2768 mK R 120 400 0 5 über 0 5 bis 6 Unbemaßte Radien Diese Sie da Änderungsbeschreibung 400 Bene 0 8 1000 30 6 0 3 120 30 0 2 Zeic Obe x Zust Gußtoleranzen Gewicht kg 0 1 2 Der Lie einwan schutz 75 Nm 75 Nm Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link ...

Page 26: ...Entwicklungsstand 120 400 0 5 über 0 5 bis 6 Unbemaßte Radien Bearb Datum Änderungs Nr Werkstoff Ausgangsteil bzw Rohteil Gepr Zone 1 x Oberflächenbehandlung Härte Blatt Änderungsbeschreibung 400 Benennung 0 8 1000 30 6 0 3 120 30 0 2 Zeichn Nr Teile Nr Oberflächenangaben ISO 1302 x xxxx xxxxx x Zust Gußtoleranzen Gewicht kg 0 1 Maßstab 1 2 WHB HG34 Ölpumpendeckel Der Lieferant muß sicherstellen d...

Page 27: ...erungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte ist nicht gestattet Wir behalten uns alle Rechte gemäß DIN ISO 16016 an dieser Zeichnung vor Unb...

Page 28: ... 1065 1071 Tools Spanner SW 13 Working course 1055 1065 2150 Slightly oil seals Install terminal board and PTC terminal board 5 I Assembly of compressor Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link http www youtube com watch v JNS9 4mNX7c 6 x SW 10 15 Nm ...

Page 29: ...cable harnesses ATTENTION Veillez impérativement au bon raccordement des faisceaux de câbles s er Reihenfolge ppen des die e Motordrähte Es ist deshalb Anschlussklem im Klemmka achten 4 Mounting the terminal board The terminal board is mounted in reverse order Note When you tip the terminal board over the connection screws for the motor wires now appear upside down It is therefore vital to ensure ...

Page 30: ...abe Passung Maß Ra Rz Tol Ang DIN ISO 2768 mK Rz 25 Rz 160 s 25 z y x w u t 0 05 Rz 1 6 0 3 0 7 1 6 2 Rz 16 6 3 Rz 63 Rz 6 3 Rz 12 5 Der Lieferant muß sicherstellen dass die Ware in einwandfreiem Zustand angeliefert wird Korrosions schutz Verpackung für sicheren Transport 65 Nm Möchten Sie diesen Montageschritt als Animation sehen Folgen Sie dem QR Code Alternativer Link http www youtube com watch...

Page 31: ...atum Nam Gepr Ausgangsteil bzw Rohteil Werkstoff Änderungs Nr Datum Bearb Diese Zeichnung ist unser Eigentum Sie darf ohne unsere Genehmigung weder nach gebildet vervielfältigt oder Dritten Personen zu gänglich gemacht werden Der Nachbau nach dieser Zeichnung oder an Hand der nach dieser Zeichnung hergestellten Gegenstände durch den Abnehmer oder Dritte ist nicht gestattet Wir behalten uns alle Re...

Page 32: ...list position Tools Working course Do the electrical installation according to the diagram in the terminal box Pay attention to the installation instruction of the compressor Close the cover at the terminal box Do the next step such as commissioning according to the installation instructions of the compressor ...

Page 33: ...4 S HC 10130 HG34P 380 4 S HC 10870 HGX34P 380 4 HC 10126 HG34P 380 4 HC 10873 HGX34P 315 4 S HC Typ Teile Nr Typ Teile Nr Typ Teile Nr Typ Teile Nr HG34e 215 4 14355 HGX34e 215 4 14359 HG34e 215 4 S 14371 HGX34e 215 4 S 14375 HG34e 255 4 14356 HGX34e 255 4 14360 HG34e 255 4 S 14372 HGX34e 255 4 S 14376 HG34e 315 4 14357 HGX34e 315 4 14361 HG34e 315 4 S 14373 HGX34e 315 4 S 14377 HG34e 380 4 14358...

Page 34: ...Stand As of date État 07 12 0e Halbhermetischer Verdichter HG Semi hermetic compressor HG Compresseur semi hermétique HG Zubehör Accessories Accessoires Typ Teile Nr Typ Teile Nr Typ Teile Nr Typ Teile Nr HG34e 215 4 A 14768 HGX34e 215 4 A 14772 HG34e 315 4 A 14776 HGX34e 315 4 A 14780 HG34e 215 4 S A 14769 HGX34e 215 4 S A 14773 HG34e 315 4 S A 14777 HGX34e 315 4 S A 14781 HG34e 255 4 A 14770 HGX...

Page 35: ...apacity regulator 3312 60 70 50 2000 170 180 181 178 K Ausführung K version Version K 3990 Schwingmetall Rubber bonded metal Silent bloc 14723 0 0850 Numéro de plan Dok ID 079770 Zeichn Nr Drawing no 1 Halbhermetischer Verdichter HG Semi hermetic compressor HG Compresseur semi hermétique HG Zubehör Accessories Accessoires Stand As of date État 07 12 0f Typ Teile Nr Typ Teile Nr HGX34P 255 2 A 1472...

Page 36: ...79 610 2170 1154 1071 1055 1065 1060 625 630 2190 1100 1110 2160 1010 1020 600 527 570 590 220 210 330 385 2060 1520 1240 1260 1200 1230 2070 2150 1220 721 1210 740 720 1250 800 810 820 2130 790 320 2050 300 290 280 270 2100 2030 2040 180 170 70 60 50 2000 178 2220 470 480 482 2110 2020 310 2080 1202 1160 1163 0c 0850 10774 Numéro de plan Dok ID 070761 0 Zeichn Nr Drawing no 1 3450 3460 3440 Venti...

Page 37: ...37 96194 05 2021 Gb ...

Page 38: ...38 96194 05 2021 Gb ...

Page 39: ...39 96194 05 2021 Gb ...

Page 40: ...40 96194 05 2021 Gb Bock GmbH All rights reserved Subject to modifications BOCK Bock GmbH Benzstraße 7 72636 Frickenhausen Germany Tel 49 7022 9454 0 Fax 49 7022 9454 137 www bock de ...