33
INFOSEC UPS SYSTEM – 4 rue de la Rigotière – 44700 Orvault – France – www.infosec-ups.com
Hot Line Tel : +33 (0)2 40 76 15 82 – fax : +33(0)2 40 94 29 51 – [email protected] – 03 15 37 59 204 03
1)
Remove the terminal block cover from the rear panel of the UPS. Then connect the wires according to the following
terminal block diagrams: (Connect the ground wire first when connecting the wires. Disconnect the ground wire
last when disconnecting wires!)
Terminal Block wiring diagram of 10KR/10KRL
Terminal Block wiring diagram of 15K (S)/20K(S)
NOTE 1:
Make sure that the wires are firmly connected to the terminals.
NOTE 2:
There are two kinds of output: output terminals/outlets (Output 1) and programmable terminals (Output
2). Please connect non-critical devices to the programmable terminal and critical devices to the output
terminals/outlets. During power failure, you may extend the backup time for critical devices by setting shorter backup
time for non-critical devices.
NOTE 3:
Please install the output breaker between the output terminal and the load, and the circuit breaker should
be qualified with a current leakage protective function if necessary.
1)
Insert the EPO plug in the EPO slot on the rear panel if needed.
2)
Put the terminal block cover back on the rear panel of the UPS.