2nd1
Transportation
The UPS must remain in a vertical position throughout the transportation.
Make sure that the floor can support the weight of the system.
2nd2
Unpacking
Equipment and batteries whose packages are damaged during transportation shall be inspected by
a qualified technical person before starting with the installation.
The procedure is as following:
Remove the bands and the protective packaging from the UPS.
Use suitable equipment to remove the UPS from the pallet.
Mount the cabinet parts supplied with the UPS after positioning and connecting the UPS.
The equipment shall be packed properly during transportation. Therefore it is recommended to
keep the original package for feature need.
Check if the following are provided with the equipment
Key of the cabin door
Battery fuses (three pieces)
Test report
2nd3
Storage
Recommended storage temperature, humidity and altitude values are listed on the “Technical
specifications” section.
If the batteries will be stored for longer than 2 months, they shall be charged periodically. Charge period
depends on the storage temperature. The relationship is as shown below:
Every 9 months if the temperature is below 20
°
C,
Every 6 months if the temperature is between 20
°
C and 30
°
C,
Every 3 months if the temperature is between 30
°
C and 40
°
C,
Every 2 months if the temperature is over 40
°
C
2nd4
Placement
2nd4.1
Environmental Requisites
This product meets the safety requirements for devices to be operated in restricted access locations
according to EN 60950-1 safety standard, which states that the owner should guarantee the following:
Access to the equipment can only be gained by service persons or by users who have been
instructed about the reasons for the restrictions applied to the location and about any precautions
that shall be taken and,