InFocus INF-MOTWALL/XSD1U Installation Instructions Manual Download Page 15

Installation Instructions

 INF-MOTWALL / XSD1U

15

Height-Adjustment Setup

1.

Loosen two hex head cap screws inside outer slots one half 

turn each to loosen top bracket. (See Figure 22)

2.

Remove top cover from INF-MOTWALL / XSD1U assembly. 

(See Figure 22)

Figure 22

3.

Loosen two Phillips screws holding inner cover to INF-

MOTWALL / XSD1U. (See Figure 22)

4.

Remove inner cover  from INF-MOTWALL / XSD1U. (See 

Figure 23)

Figure 23

5.

Install control pad bracket (Q) at desired control pad 

location. May be installed on either side, top or bottom, 

depending on user preference. (See Figure 24)

NOTE:  

The control pad (P) may also be installed to the bottom 
edge of the display using the double-sided tape (U). If 
this is desired, plug the switch directly to port A1 or A2 
to initialize and route cable after display is installed.

Figure 24

6.

Use #6-32 x 3/8" button head cap screw (M) to secure 

control pad bracket (Q) to mount. (See Figure 25)

Figure 25

7.

Install control pad (P) onto control pad bracket (Q). (See 

Figure 25)

8.

Route and connect control pad cable to actuator box into 

port A1 or A2. (See Figure 26)

Figure 26

x 2

(half turn)

1

2

2

3

x 2

4

(Q)

(M)

6

(Q)

7

(P)

8

8

actuator

box

control

pad cable

Summary of Contents for INF-MOTWALL/XSD1U

Page 1: ...ioni di installazione Installatie instructies Instructions d installation Lowest position Highest position Electric Height Adjustable Wall Mount Spanish Product Description German Product Description...

Page 2: ...this furnishing is used by or near children invalids or disabled persons 3 Use this furnishing only for its intended use as described in these instructions Do not use attachments not recommended by th...

Page 3: ...s marked with the symbol square within a square NOTE This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to Part 15 of the FCC Rules These limits a...

Page 4: ...20 37 517 4 MAX MIN 7 94 201 6 MAX 33 94 862 10 13 257 2 C L to UPPER MOUNTING POINT 26 76 679 6 40 13 1019 3 100MM 24 00 609 6 16 00 406 4 0 84 21 4 9 98 253 4 12 83 326 0 24 12 612 7 PLUMB 26 94 684...

Page 5: ...hl ssel Chave de bocas Chiave a punte aperte Steeksleutel Cl fourche By Hand A mano Von Hand Com a m o A mano Met de hand la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschl ssel Chave de...

Page 6: ...Bluetooth Remote R 1 F 4 Concrete anchor Cable tie J 4 1 4 20 Toggler P 1 Control pad A 1 INF MOTWALL XSD1U assembly C 8 E 1 Bluetooth Dongle S 1 5 64 G 4 5 16 x 2 1 2 K 4 1 4 20 x 2 1 2 L 4 1 4 M 1 6...

Page 7: ...4 TL 4 TP 1 1 8 Hardware Kit Bag A Bag B Bag C Bag D Bag E Bag F Bag G Bag H Bag I Bag J Bag K Bag L Bag M TB 4 M4 x 20mm 10 24 x 1 2 M4 x 25mm M5 x 12mm M5 x 20mm M5 x 25mm M6 x 12mm M6 x 20mm M6 x 2...

Page 8: ...Mark hole locations at each mounting location in the center of each stud See Figure 1 4 Drill two 7 32 holes at marked hole locations See Figure 1 5 Install two 5 16 x 2 1 2 hex head cap screws G thr...

Page 9: ...igure 6 3 Drill two 3 8 holes at marked hole locations See Figure 6 4 Install a concrete anchor F into each pilot hole using a hammer making sure that the anchor is flush with the wall See Figure 6 5...

Page 10: ...the wall See Figure 10 Figure 10 12 Hang wall mount back onto top bracket and install two 5 16 x 2 1 2 hex head cap screws G through two 5 16 washers H lower mounting holes on mount and into concrete...

Page 11: ...ds If back side of wall is unfinished drywall must be installed to a minimum of one stud left and right of the stud s being used to install the mount Drywall must be secured to studs with screws a max...

Page 12: ...mm clearance inside wall 16 on center Studs If back side of wall is unfinished drywall must be installed to a minimum of one stud left and right of the studs being used to install the mount Drywall mu...

Page 13: ...wards wall until flange of cap is flush with wall See Figure 15 Figure 15 7 Snap off plastic straps on anchor at wall by pushing side to side snapping off straps level with flange of plastic cap See F...

Page 14: ...gure 19 14 Mark hole locations for lower two mounting holes See Figure 20 15 Remove mount A from top bracket 16 Drill two 1 2 holes at marked hole locations See Figure 20 Figure 20 17 Install a toggle...

Page 15: ...May be installed on either side top or bottom depending on user preference See Figure 24 NOTE The control pad P may also be installed to the bottom edge of the display using the double sided tape U If...

Page 16: ...to be partially extended in order to re install top cover 14 Re install top cover and tighten button head cap screws to secure it in position See Figure 29 Figure 29 15 Re install bottom cover and sec...

Page 17: ...in display 7 Adjust vertical mounting bracket TR position until mark made in Step 1 aligns with center mark in vertical mounting bracket TR 8 Select correct screws nesting spacers if necessary and un...

Page 18: ...ket TU aligns with mark made in Step 11 and mounting holes and slots in horizontal mounting bracket TQ are aligned with threaded holes in mounting tabs of left and right vertical mounting brackets TR...

Page 19: ...See Figure 38 Figure 38 Save Height Levels 1 Adjust height until desired preset level is reached using UP and DOWN buttons See Figure 38 2 Press SAVE button See Figure 38 3 Press one of three preset...

Page 20: ...est position to ensure cables are installed with enough slack 1 Use cable clips and or cable ties C to route cables as desired See Figure 41 2 Route cables through opening on bottom cover if a power b...

Page 21: ...Installation Instructions INF MOTWALL XSD1U 21...

Page 22: ...INF MOTWALL XSD1U Installation Instructions 22...

Page 23: ...Installation Instructions INF MOTWALL XSD1U 23...

Page 24: ...INF MOTWALL XSD1U Installation Instructions 8800 003139 Rev00 2019 InFocus Corporation www infocus com 03 19 InFocus Corporation 13190 SW 68th Parkway Ste 200 Portland OR 97223...

Reviews: