P a g e
|
15
Issue No 2
890 HD BF INSTALLATION INSTRUCTIONS
Please note with early cavity wall design prior to 1970. The minimum depth requirement may well be difficult
to obtain. This could result in the need for the firebox to be spaced further from the internal surface of the
plaster and to achieve this larger rebated surround maybe necessary.
Ensure that the transit bolts are removed from the top
of the firebox before installation.
Check with the supplier or manufacturer that the surround meets 150
0
C minimum rating (attention should
especially be given to manmade materials such as resin).
Builder’
s opening aperture size required to install this product.
* Will required an additional 12mm of depth when installed Dry lined hole
in the wall
Summary of Contents for 890 HDBF
Page 35: ...P a g e 34 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Page 36: ...P a g e 35 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS Maintenance...
Page 37: ...P a g e 36 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Page 38: ...P a g e 37 Issue No 2 890 HD BF SERVICE FAULT FINDING INSTRUCTIONS...
Page 46: ...P a g e 45 Issue No 2...
Page 47: ...P a g e 46 Issue No 2...